AVTMMIT30-EN Rev E02 June 2009
19
7
OPERATION
When the test set and apparatus to be tested are
set up as indicated in Section 6, the equipment
can be energized and the required tests run by
following the steps given below.
Note:
Before operating the test set, read Section 2 of
this manual and ensure that all appropriate
safety precautions are observed.
TEST PROCEDURE
1.
Complete connection procedure as outlined in
Section 6.
2.
Remove all safety grounds from the apparatus
to be tested
3.
Close the mains switch, the power indicator
will illuminate.
4.
Set the overcurrent trip to the desired trip
level.
5.
Set the ionization volume to the desired level.
Содержание MIT30
Страница 2: ......
Страница 3: ...30kV DC Insulation Tester MIT30 Catalog No MIT30 Instruction Manual...
Страница 6: ...AVTMMIT30 EN Rev E02 June 2009 ii M...
Страница 12: ...M AVTMMIT30 EN Rev E02 June 2009 6 M...
Страница 14: ...M AVTMMIT30 EN Rev E02 June 2009 8 M...
Страница 20: ...M AVTMMIT30 EN Rev E02 June 2009 14 M...
Страница 24: ...M AVTMMIT30 EN Rev E02 June 2009 18 M...
Страница 34: ...M AVTMMIT30 EN Rev E02 June 2009 28 M...
Страница 37: ...OPERATION TROUBLESHOOTING AVTMMIT30 EN Rev E02 June 2009 31 Troubleshooting Chart Figure 1...
Страница 38: ...M AVTMMIT30 EN Rev E02 June 2009 32 M...
Страница 40: ...M AVTMMIT30 EN Rev E02 June 2009 34 Figure 2...
Страница 41: ...NOMENCLATURE AVTMMIT30 EN Rev E02 June 2009 35 This page intentionally left blank...
Страница 43: ...NOMENCLATURE AVTMMIT30 EN Rev E02 June 2009 37 Figure 4...