i
AVTM21-415Ja Rev. A June 2005
Table of Contents
1 INTRODUCTION.....................................................................................1
2 SAFETY PRECAUTIONS.......................................................................3
3 RECEIVING INSTRUCTIONS.............................................................5
4 SPECIFICATIONS....................................................................................7
5 DESCRIPTION ....................................................................................... 13
6 CONTROL & CONNECTOR IDENTIFICATION...................... 17
7 SETTING UP........................................................................................... 19
Preparation ................................................................................................19
Selection of Location...............................................................................19
Clearances..................................................................................................21
8 OPERATION........................................................................................... 27
Test Procedure..........................................................................................27
Breakdown of Test Item .........................................................................28
Normal Shutdown Procedure ................................................................29
Interrupting a Test ...................................................................................29
9 OPERATION NOTES........................................................................... 31
Line Supply................................................................................................31
Meter Range Settings During Transit....................................................31
Megohm Readings....................................................................................31
Correction for Internal Leakage.............................................................33
Stabilizing Switch......................................................................................33
Use of Guard (See Also Section 10)......................................................34
Voltage Control Scale ..............................................................................35
Use of Regulation Curve .........................................................................35
Step Voltage Testing................................................................................35
Fault Locating (Breakdown Testing).....................................................36
External Current Meter...........................................................................37
Содержание ATEC 210415 Series
Страница 2: ...15 kV Megohmmeter Test Set Catalog No 210415 Series M...
Страница 9: ...M 2 AVTM21 415Ja Rev A June 2005 Figure 1 15 kV Megohmmeter Test Set Catalog No 210415...
Страница 13: ...M 6 AVTM21 415Ja Rev A June 2005 M...
Страница 19: ...M 12 AVTM21 415Ja Rev A June 2005 M...
Страница 23: ...M 16 AVTM21 415Ja Rev A June 2005 Figure 2 Schematic Diagram of the 15 kV Megohmmeter...
Страница 30: ...SETTING UP 23 AVTM21 415Ja Rev A June 2005 Figure 4 Testing in a Substation...
Страница 32: ...SETTING UP 25 AVTM21 415Ja Rev A June 2005 Figure 6 Testing Transformer Terminals...
Страница 33: ...M 26 AVTM21 415Ja Rev A June 2005 Figure 7 DC Motor Test Setup Figure 8 Generator Test Setup...
Страница 47: ...M 40 AVTM21 415Ja Rev A June 2005 M...
Страница 53: ...M 46 AVTM21 415Ja Rev A June 2005 M...
Страница 57: ...M 50 AVTM21 415Ja Rev A June 2005 M...
Страница 73: ...M 66 AVTM21 415Ja Rev A June 2005 Figure 15A Interior View Figure 15B Interior View...
Страница 75: ...M 68 AVTM21 415Ja Rev A June 2005 M...
Страница 81: ...M 74 AVTM21 415Ja Rev A June 2005 M...
Страница 82: ...M 2621 Van Buren Avenue Norristown PA 19403 1 800 723 2861 ext 8578 megger com...