M
30
AVTM21-415Ja Rev. A June 2005
the test voltage in the shortest possible time. If the stabilizer is
out the AC "ON" or HV "ON" circuit breakers will trip or
they can be operated manually. If the stabilizer is "IN" it is
necessary to open either the HV "ON" or the AC "ON"
switches manually to permanently de-energize the test. This
procedure should be followed only when absolutely necessary
since there is a risk of damage to both the Test Set and the
apparatus being tested.
Содержание ATEC 210415 Series
Страница 2: ...15 kV Megohmmeter Test Set Catalog No 210415 Series M...
Страница 9: ...M 2 AVTM21 415Ja Rev A June 2005 Figure 1 15 kV Megohmmeter Test Set Catalog No 210415...
Страница 13: ...M 6 AVTM21 415Ja Rev A June 2005 M...
Страница 19: ...M 12 AVTM21 415Ja Rev A June 2005 M...
Страница 23: ...M 16 AVTM21 415Ja Rev A June 2005 Figure 2 Schematic Diagram of the 15 kV Megohmmeter...
Страница 30: ...SETTING UP 23 AVTM21 415Ja Rev A June 2005 Figure 4 Testing in a Substation...
Страница 32: ...SETTING UP 25 AVTM21 415Ja Rev A June 2005 Figure 6 Testing Transformer Terminals...
Страница 33: ...M 26 AVTM21 415Ja Rev A June 2005 Figure 7 DC Motor Test Setup Figure 8 Generator Test Setup...
Страница 47: ...M 40 AVTM21 415Ja Rev A June 2005 M...
Страница 53: ...M 46 AVTM21 415Ja Rev A June 2005 M...
Страница 57: ...M 50 AVTM21 415Ja Rev A June 2005 M...
Страница 73: ...M 66 AVTM21 415Ja Rev A June 2005 Figure 15A Interior View Figure 15B Interior View...
Страница 75: ...M 68 AVTM21 415Ja Rev A June 2005 M...
Страница 81: ...M 74 AVTM21 415Ja Rev A June 2005 M...
Страница 82: ...M 2621 Van Buren Avenue Norristown PA 19403 1 800 723 2861 ext 8578 megger com...