8
2.2. Output Terminals
~
Green E (E
XC
)
Terminal
– Earth Electrode
Black ES (E
XT
)
Terminal – Voltage Electrode
Blue S (E
T
)
Terminal
– Voltage Electrode
Red H (E
C
)
Terminal
– Current Injection
E
-
ES
-
S
-
H:
Standard nomenclature currently recommended by the IEC.
E
XC
-
E
XT
-
E
T
-
E
C
:
Nomenclature traditionally used by Megabras earth
meters. It is maintained to make migration easy.
Having the function selector switch in the R position (grounding resistance
measurement) the E and ES terminals are internally shorted. The ES
terminal is not used for this measurement.
2.3. Internal battery
The
MTD-20KWe
has a built-in rechargeable battery. Furthermore, it can be
powered by means of an external 12 V battery.
2.4. Battery status check
~
Before starting each test, it is recommended to check if the internal battery
has enough charge. This can be done by pressing the
Battery Test
Pushbutton
+
. The value shown on the display
must be higher than
1000
. If it is not, the battery needs to be charged. This checking can be
repeated during measurements, under the equipment highest consumption
conditions.
2.5. Power supply source
~
The power supply source provided can be connected to 220-240 V~ mains.
It is used to charge the battery.
Содержание MTD-20KWe
Страница 2: ...4 This page was left blank intentionally...
Страница 20: ...22 Notes...
Страница 21: ...23 MTD 20KWe Telur metro digital Manual de uso...
Страница 22: ...24...
Страница 32: ...34 a b a 4 D a 2 b 2 b 4 a 4 B E A b 4 C Puntos de medici n A B C D E Direcciones de medici n x y y x fig 04...