background image

F00637

 

Page 11

WINTERIzING

If pump is to be out of service for an extended period of 
time, such as the winter months, the following storage 
procedures should be followed:
•  Remove exterior dirt and grime or any substance 

that may trap moisture. Exposed metal is subject to 

oxidation; prime and repaint if necessary. If this is not 

possible, coat with grease or heavy oil.

•  Flush suction and discharge lines. Check for leaks at 

this time and replace any worn gaskets.

•  Remove lowest plug in pump and drain pump casing 

and suction/discharge lines.

•  Lubricate bearings.
•  If possible, keep unit clean and dry during storage 

period to guard against corrosion.

•  Seal all open ports to keep out foreign objects such 

as insects, rodents, dust and dirt.

•  Rotate driver shaft periodically to prevent freeze-up 

of internal components.

•  Shelter unit from elements if possible.
•  Work oil into impeller wear ring by dripping oil into 

the gap while rotating by hand.

SPRING START-UP

•  Inject sufficient grease into the bearings to displace 

old grease. (See Bearing Frame Lubrication in Start-

up section).

•  Visually inspect pump.
•  Rotate by hand, if any binding occurs, disassemble 

and inspect.

ROUTINE MAINTENANCE

A well maintained pumping system will extend the life 
of the unit and will require fewer repairs. This means 
less down time which can be very critical when constant 
delivery of water is required.
A routine maintenance and inspection schedule should 
be set up on a weekly, quarterly, and annual basis 
with records kept of these actions. For weekly checks, 
refer to general maintenance. For quarterly and annual 
maintenance, refer to routine inspection check list. Copy 
page as necessary for continual usage.

General Information

Maintenance

RECOMMENDED SPARE PARTS

It is recommended that the following spare parts be kept 
on-site as a minimum back-up to service your pump 
and reduce down-time. Check your model/style against 
parts breakdown; See 

FIGURES 1 and 2 when selecting 

spares.
•  Mechanical Shaft Seal
•  Packing Set and Packing Hooks
•  Shaft Sleeve(s)
•  All O-Rings Required for One Pump
•  Wear Rings
•  Retaining Rings
If having a pump non-operational has severe 
consequences, a back-up pump should be considered.
Otherwise, a back-up impeller, volute case, bearings 
and shaft are advised.
PUMP DECONTAMINATION

 

Before disassembling 

a pumping unit, it is very important to ensure that the 

unit is thoroughly cleaned and there are no residual 

contaminants that could cause injury or illness.  The 

method of cleaning pumps will vary with the design and 

construction of the pump. In general, the pump needs 

to be properly drained, flushed out, and any evidence 

of contamination removed. Contents of the pump, 

cleaning materials, and wash-down materials should 

be properly disposed. In addition to thorough cleaning, 

disinfecting all surfaces for protection from injury and 

illness is recommended. During the decontamination 

and disassembly work to the pump, workers are 

required to wear protective clothing and equipment 

to protect them from exposure to potentially harmful 

materials.
When decontaminating a pump, it is important to use 

a fluid or compound that will not damage (e.g., corrode 

or swell) pump components. Often the pump materials 

of construction are suitable for limited corrosive service 

with pumpage liquids, such as potable water. Limited 

contact time with the pump is recommended. Before 

disinfection or decontamination of a pumping unit, 

careful consideration must be given to the following 

items: mixing concentration prior to entering the 

pump, method of dosage, and pumping operation, 

e.g., limiting flow, throttling, and limiting retention time. 

Pump components particularly sensitive to disinfection 

fluids or compounds include pump shafting, bearing 

journals, and elastomeric sleeve-type bearings. 

It is recommended to always contact the pump 

manufacturer prior to disinfecting or decontaminating a 

pump.

Содержание M4B

Страница 1: ...E Albuquerque NM 87113 Phone 800 345 8889 www MegaCorpInc com Important For best possible performance and continuous satisfactory operation read these instructions before installing your new pump Shou...

Страница 2: ...rts Breakdown 6 7 Start up General Information 8 9 Maintenance Routine Inspection 10 General Information 11 Packing Ring Replacement 12 Shaft Sleeve Installation Replacement 13 Impeller Replacement 14...

Страница 3: ...alert symbol When you see this symbol on your pump or in this manual look for one of the following signal words and be alert to the potential for personal injury warns about hazards that will cause s...

Страница 4: ...g box packing Fill the stuffing box with a crusting grease Rust Ban 326 or equal then pack the end of the stuffing box with rolled vapor phase inhibitor paper and seal with weatherproof tape Dry pump...

Страница 5: ...mp plate is normally on the bearing bracket Information found on this plate is shown below To ensure correct parts are received provide all nameplate data when ordering The B M Bill of Material number...

Страница 6: ...screw Lock External Tooth Washer Casing Wear Ring Casing O Ring Impeller Wear Ring Seal Plate Frame Mount Bracket Grease Fitting Hex Capscrew Pipe Plug Stud Hex Nut Shaft Sleeve Bearing Cap Motor Brac...

Страница 7: ...r Ring Casing O Ring Impeller Wear Ring Seal Plate Frame Mount Bracket Grease Fitting Hex Capscrew Pipe Plug Oil Seal Hex Capscrew Shaft Sleeve Pipe Plug Roller Bearing Shaft Bearing Cap Motor Bracket...

Страница 8: ...riming is the displacement of air with water in the pump and suction piping Pump MUST BE completely filled with water when operating HYDRAULIC BALANCED PUMPS Hydraulic balanced pumps operate with a ve...

Страница 9: ...area and gland are not hot If heating is detected loosen the gland nuts evenly until water is just running out of stuffing box in a DROPLET form approximately 40 60 drops per minute Water must not be...

Страница 10: ...t all system piping connections for leakage or possible misalignment Complete any lubrication requirements as dictated by pump and driver owner s manual Inspect packing or mechanical seal for possible...

Страница 11: ...ur pump and reduce down time Check your model style against parts breakdown See FIGURES 1 and 2 when selecting spares Mechanical Shaft Seal Packing Set and Packing Hooks Shaft Sleeve s All O Rings Req...

Страница 12: ...cing over shaft sleeve and pushing them in as far as they will go Rotate ring joint 90 degrees when installing each ring Slide packing gland into position gland must enter stuffing box bore then gentl...

Страница 13: ...ew sleeve onto the shaft Rotate the sleeve at least twice before butting it against the shaft shoulder Wipe any excess adhesive off the shaft and sleeve NOTE With activator the adhesive will begin to...

Страница 14: ...place the casing wear ring Check the clearance between the impeller hub wear ring and seal plate wear ring If it is more than 020 0 5 mm on a side replace the seal plate wear ring IMPELLER INSTALLATIO...

Страница 15: ...to place See FIGURE 6 Do not damage the seal face 10 Reinstall the seal plate Hold in place with 2 capscrews Cover all shaft threads with the seal installation bull nose tool to protect the seal durin...

Страница 16: ...als in the bearing bracket and bearing cap Lubricate with oil Pack bearings with a lithium based NLGI No 2 extra pressure ball bearing grease Force enough grease into each bearing to fill internal spa...

Страница 17: ...ot properly adjusted Adjust gland III SYSTEM A Pressure required by system at design Compare pump pressure and flow rate against pump characteristic curve flow rate exceeds pressure rating of pump Che...

Страница 18: ...Page 18 F00637...

Страница 19: ...F00637 Page 19...

Страница 20: ......

Отзывы: