background image

00243 

Main features

 

SEC-Le 

Connections to panel: marked on board 
 
1. 

Live & Neutral 230 volts supply from 3amp switched fuse spur 

2. 

230 volts out to gas solenoid valve (required) 

3. 

To contactor for isolating bench socket electricity supply (optional) see page 9 

4. 

volts out to water supply isolation valve 

5. 

Earth connection terminals 

6. 

Remote emergency stop and thermal links, SELV, connect in series multiple buttons (requires a N/C circuit) 

7. 

Extract fan interlock for current monitor (CM2M-K) or PD switches.  

8. 

Supply fan interlock for current monitor (CM2M-K) or PD switches.  

9. 

12 volt power for current monitor (CM2M-K) 

10. 

Pressure sender unit SELV and comm’s both through “A” & “B” terminals (2 wire) 

(Required)

 

11. 

Power connections for detectors, Methane, LPG, CO, CO2, Oxygen, Temperature 

12. 

Comms connections for detectors, Methane, LPG, CO, CO2, Oxygen, Temperature 

13. 

Fire alarm input signal (N/C contact required).  

14. 

0-10 volt output to fan speed controllers based on CO2 and temperature levels 

15. 

Three relays, outputs for connection to a BMS see page 4 for full details. 

16. 

OPTA=Over pressure check, will isolate gas supply if pressure exceeds 70 mbar 

17. 

Fill & prove time for gas pressure proving, see page 5. 

18. 

Timer adjustment for fan commissioning, allows timed period for gas installation commissioning. 

19. 

Auto stop timer to isolate gas after set length of time. Factory set for model & use 

20. 

CO2 alarm level adjustment depending on application. Factory set for model & use 

21. 

High pressure low cut out adjustment (

when high pressure sender unit is used  1 bar>

22. 

Fan comm button, enables commissioning of the gas supply without fans running. 

23. 

Learn field device button, press once only when all detectors are connected and powered (verify with Blind button 

B

). 

24. 

Selector switch to disable audible alarm sounder. 

25. 

Lift valve button, opens the gas valve only whilst the button is continuously pressed, for commissioning purposes. 

26. 

Fill/Prove Multiplier SW=X2 multiplies the prove time by 2, CPI=ACTV Can monitor position of a CPI switch on a gas valve when 
used with a CPI pressure sender unit. 

27. 

OPTL Enable/Disable the front panel “FANS” LED (switch on to disable) 

Power at 230 

volts from a 

3amp fused spur

 

17 

26 

24 

27 

10 

11 

12 

13 

14 

15 

16 

18 

19 

21 

20 

22 

23 

25 

Содержание SEC-Le V4

Страница 1: ...safety system is installed and commissioned to the satisfaction of the manufacturer A commissioning certificate must be issued to the end user along with instructions for the operation of the equipme...

Страница 2: ...buttons A and B for engineer functions LED indications Power On green A blind button for displaying gas pressures on the LCD screen Gas Electric red when active to warn of live service Fans running li...

Страница 3: ...age 4 for full details 16 OPTA Over pressure check will isolate gas supply if pressure exceeds 70 mbar 17 Fill prove time for gas pressure proving see page 5 18 Timer adjustment for fan commissioning...

Страница 4: ...Max switching 48 volts 1 amp 15 BMS Relay PCB Press button A To display the gas pressures and view the set pressure proving set times Press button B To display the gas installed gas detectors 1 8 pre...

Страница 5: ...1 Option Headers 18 19 21 20 Fan comm To enable the commissioning of the gas portion of the system before the ventilation interlock is completed you may temporarily disable the interlocking by pressin...

Страница 6: ...e the gas detectors own instructions for more guidance SEC Le Detector Information VE supply Comm s From either the main panel or an extender Detectors are wired in parallel and can be connected to on...

Страница 7: ...een 1m and 3m from the potential source Care should be taken so they are not located close to the edge of a canopy or in direct flow of the supply or extract ventilation For additional information or...

Страница 8: ...nnel current Monitor fans Fan speed controls Fan live Supply Fire Alarm Requires a volt free NC contact Where using 3 phase fans interlock on a single phase See page nine Earth Connections not shown 0...

Страница 9: ...sent within the panel IMPORTANT If wired this way a warning notice must be attached to the panel to indicate that there are two separate mains feeds Contactor coil Live feed through switched relay To...

Страница 10: ...s fitted the correct way round Note there is no flow through the pressure sender unit it is purely reading the pressures either side of the valve Correct Pressur e Solenoid Never mount the valve such...

Страница 11: ...Solenoid coil of the valve should never be mounted below the horizontal Pressure sender unit should never be mounted upside down to protect from water ingress Approx 400mm length INLET PORT OUTLET PO...

Страница 12: ...ld be wired in series with the EM stop buttons To EM Stop connections in the panel Indicator bar shows when pressed Normal EM Stop Activated Multiple Stop Buttons Single Stop Buttons Resetting indicat...

Страница 13: ...er Medem UK will exchange faulty valves for return to the manufacturer 5 Where a Medem UK engineer or another company appointed by Medem UK commission and installed system then that system will carry...

Страница 14: ...CD display that all the detectors have been recognised by the panel A recognised detector will appear as CO Carbon Monoxide CM combustible CH Carbon Dioxide OX Oxygen depletion and TP Temperature Coun...

Страница 15: ...ssure test If at any point the fans stop running opening the S1 or E1 contact the system will isolate the gas and report fans not running Check that the fans are not only switched on but actually runn...

Отзывы: