   17. Fill and Prove 

Gas Fill Time.   

The Fill Time should be set such that there is sufficient time to fill an empty pipe work 
system to full / normal pressure while ensuring a minimum escape of gas where a leak 
exists. 
(Factory default setting is 5 seconds).  

 

Gas Prove Time. 

This should be set such that the smallest leak can be detected. This time 

can be set up to a maximum of 9 minutes. Increasing this time effectively makes the 
system more sensitive to gas leaks.  
(Factory default setting is 1 minute).  
 
 
FILL switch @ 1,2,3,4,5,6,7,8,9,0 =  1s, 2s, 3s, 4s, 5s, 6s, 7s, 8s, 9s, 10s,  
PROVE switch @ 1,2,3,4,5,6,7,8,9,0 = 1m, 2m, 3m, 4m, 5m, 6m, 7m, 8m, 9m, 30s,  
 
The prove time can be extended using FILL/PROVE MULTIPLIER, see 

No 26

18. 

Timer adjustment for fan commissioning, allows timed period for gas installation 

commissioning. 

 

19. 

Auto stop timer to isolate gas after set length of time. Factory set for model & use 

 

20. 

CO2 alarm level adjustment depending on application. Factory set for model & use 

 

21. 

High pressure sender unit: Low pressure cut out adjustment (for systems over 1 bar) 

    18, 19, 20, 21 Option Headers 

18 

19 

21 

20 

Fan comm.  

To enable the commissioning of the gas portion of the system before the ventilation interlock is 
completed you may temporarily disable the interlocking by pressing button 

22.  

This will bypass the ventilation interlock allowing the gas to be tested, the system must not be 
left in this state and as such is only for a maximum 24hour period before auto exiting. 

While in 

commissioning mode the display will show the message “Not to current standards”

.  Pressing 

the button again at anytime will cancel commissioning mode. 

 

Learn Field devices.  

Any gas detectors connected to the system will require “learning”. First ensure all detectors are set to a unique ID address using 
the selector switch on the detectors themselves, with CO & CO2 detectors numbered before any natural gas detectors. 
Having addressed each detector press the learn field devices button (

23

), the system will scan and store any connected 

detectors. To verify that all detectors have been successfully learnt press the “blind button B” on the front panel to view address 
details. 

 

    22, 23  Fan Comm & Learn Detectors 

22 

23 

System Settings

 

SW = X2 

This doubles the fill & prove time. 

SW = X0.5 

This halves the fill and prove time test, please note the minimum prove time is 30 

seconds which cant be reduced any lower.

 

   26. Fill/Prove multiplier 

SEC-L 

v4

 

Содержание SEC-L v4

Страница 1: ...s installed and commissioned to the satisfaction of the manufacturer A commissioning certificate must be issued to the end user along with instructions for the operation of the equipment As the Manufa...

Страница 2: ...e Blind buttons A and B for engineer functions LED indications Power On green A blind button for displaying gas pressures on the LCD screen Gas Electric Water red when active to warn of live service F...

Страница 3: ...for full details 16 OPTA Over pressure check will isolate gas supply if pressure exceeds 70 mbar 17 Fill prove time for gas pressure proving see page 5 18 Timer adjustment for fan commissioning allow...

Страница 4: ...ip switches One condition selectable from each relay Max switching 48 volts 1 amp 15 BMS Relay PCB Press button A To display the gas pressures and view the set pressure proving set times Press button...

Страница 5: ...comm To enable the commissioning of the gas portion of the system before the ventilation interlock is completed you may temporarily disable the interlocking by pressing button 22 This will bypass the...

Страница 6: ...hat is being monitored for See the gas detectors own instructions for more guidance The maximum cable length between a detector and the control panel should not exceed 100 metres whilst we would alway...

Страница 7: ...ween 1m and 3m from the potential source Care should be taken so they are not located close to the edge of a canopy or in direct flow of the supply or extract ventilation For additional information or...

Страница 8: ...ed through the Medem CM2M K2 channel current Monitor fans Fan speed controls Fan live Supply Fire Alarm Requires a volt free NC contact Where using 3 phase fans interlock on a single phase See page ni...

Страница 9: ...hin the panel IMPORTANT If wired this way a warning notice must be attached to the panel to indicate that there are two separate mains feeds Contactor coil Live feed through switched relay To bench so...

Страница 10: ...the correct way round Note there is no flow through the pressure sender unit it is purely reading the pressures either side of the valve Correct Pressur e Solenoid Never mount the valve such that the...

Страница 11: ...d coil of the valve should never be mounted below the horizontal Pressure sender unit should never be mounted upside down to protect from water ingress Approx 400mm length INLET PORT OUTLET PORT Note...

Страница 12: ...red in series with the EM stop buttons To EM Stop connections in the panel Indicator bar shows when pressed Normal EM Stop Activated Multiple Stop Buttons Single Stop Buttons Resetting indicator bar T...

Страница 13: ...UK will exchange faulty valves for return to the manufacturer 5 Where a Medem UK engineer or another company appointed by Medem UK commission and installed system then that system will carry a ten ye...

Страница 14: ...D display that all the detectors have been recognised by the panel A recognised detector will appear as CO Carbon Monoxide CM combustible CH Carbon Dioxide OX Oxygen depletion and TP Temperature Count...

Страница 15: ...st If at any point the fans stop running opening the S1 or E1 contact the system will isolate the gas and report fans not running Check that the fans are not only switched on but actually running and...