Mecmesin MultiTest 1 Скачать руководство пользователя страница 8

page 6

APPENDIX 1   

A GUIDE TO THE SAFE USE OF MAINS POWERED TEST FRAMES

MECMESIN TEST FRAMES HAVE BEEN DESIGNED AND MANUFACTURED IN A CONTROLLED SYSTEM
TO ENSURE COMPLIANCE WITH ALL RELEVANT EUROPEAN COMMUNITY DIRECTIVES.

To downlaod a copy of the EC declaration of conformity, please go to www.mecmesin.com in the Literature
& FAQ section, then double-click on Certificates of Conformity.

Receiving and Unpacking

1

Upon receiving the Mecmesin test frame ensure adequate equipment is available to safely lift the test 
frame from the packaging. Trying to lift heavy items without adequate assistance or the correct 
equipment may lead to accidental personal injury.

2  Once safely removed from the packaging place the test frame on a stable and level work surface. Inspect

the machine for any signs of obvious transit damage.

IF ANY DAMAGE IS DISCOVERED DO NOT GO ANY FURTHER WITH INSTALLATION AND DO NOT
CONNECT TO MAINS SUPPLY UNDER ANY CIRCUMSTANCES.

Contact your local supplier immediately who will decide the most appropriate action to rectify the situation as
quickly as possible.

Installing the Machine

3  After placing the machine on a stable and level work surface, check that the mains inlet voltage 

corresponds to your electrical installation - either 230 Vac or 110 Vac. The machine has a label close 
to the mains inlet connector which advises which voltage is set for.
If the machine does not correspond to your supply, inform your local Mecmesin supplier who will rectify
the situation. Connecting a mains powered test frame to the wrong supply will almost certainly cause 
extensive damage to the equipment.

The Mecmesin test frames must only ever be connected to a mains power installation that has a fully 
installed earthing system.

CONNECTING A MAINS POWERED TEST FRAME TO AN ELECTRICAL POWER OUTLET WITHOUT AN
EARTH CONNECTION IS EXTREMELY DANGEROUS AND COULD LEAD TO A RISK OF ELECTROCUTION.

Mecmesin test frames should only ever be installed in suitable environmental conditions. The 
operating temperature should be within the range 5ºC to 40ºC and the relative humidity should not
exceed 92.5%.

After all the above points have been checked and confirmed to be correct you may connect the 
machine to the mains outlet only with the supplied mains lead.

When power is applied with the ON/OFF switch in the ‘ON’ position the mains indicator light will illuminate.
This shows power is reaching the machine and it is therefore ready for use.
Check its basic operation with reference to the operating manual.

Operator Training

4

Each person who is to use the machine should be fully trained in the safe use of the motorised testing 
machines. The machine has the ability to generate forces large enough to cause permanent damage to
human limbs if placed between the crosshead and the base.

Содержание MultiTest 1

Страница 1: ...It is essential that you familiarise yourself with the contents of these instructions before attempting to operate the MultiTest 1 MultiTest 1 Motorised Test Frame Operating Instructions ...

Страница 2: ......

Страница 3: ...ent immediately We strongly recommend that all the packaging and fixings are retained for any future transit requirements When using the MultiTest 1 please ensure that the ventilation holes situated on the back and bottom of the unit are not obstructed Also attach the four rubber feet to the MultiTest 1 with the screws provided Do not over tighten screws Before Use Appendix 1 gives guidance notes ...

Страница 4: ...munity Directives The MultiTest 1 has a single variable speed control for both upward and downward directions Speed can be set and controlled by the knob A in fig 1 on the front panel The white pointer on the speed control knob gives an indication of the speed setting Some test Standards place particular requirements upon speed accuracy reproducibility which may exceed the normal performance of th...

Страница 5: ...tion and then release The crosshead will move and the LED indicating direction of travel will illuminate When a limit switch position is reached the crosshead will begin to travel in the opposite direction at full speed When the position of the other limit switch is reached the motor will stop and the crosshead will come to rest During the cycle setting the Mode switch to Manual Control or selecti...

Страница 6: ...le damage would be to drive the test frame downwards until the loadcell or loadcell stud on AFG BFG instruments hits something solid This is a risk when a user is not yet familiar with operating a new test frame Consequently it is essential to set the limit switches B in fig 1 so that upwards downward travel of the crosshead is limited to prevent over travel and drive the gauge into the grips stan...

Страница 7: ...8in Operating modes Manual single cycle with fast return Reverse on alarm point Yes with AFG or AFTI cable Reverse on sample break Yes with AFG or AFTI cable ENVIRONMENTAL OPERATING CONDITIONS Temperature range 5ºC to 40ºC Humidity 92 5 STANDARD LOAD MEASUREMENT OPTIONS Force Gauge and dovetail bracket Yes Anvil plate Yes S beam Loadcell tension block module AFTI Yes SPECIAL OPTIONS Increased cros...

Страница 8: ...abel close to the mains inlet connector which advises which voltage is set for If the machine does not correspond to your supply inform your local Mecmesin supplier who will rectify the situation Connecting a mains powered test frame to the wrong supply will almost certainly cause extensive damage to the equipment The Mecmesin test frames must only ever be connected to a mains power installation t...

Страница 9: ...afe Use 7 Once the machine is installed it should provide a reliable long term resource for universal testing If however the machine fails or appears to behave in an unusual manner contact your local supplier for support Do not continue to use the machine until it has been checked and if necessary repaired and returned to a safe working condition 8 If the machine is damaged in use advise your loca...

Страница 10: ...arge M6 plain washers 5 Place all accessories listed to be despatched with the stand in the box with the test frame including the feet Ensure that the accessories and operators manual handbook are suitably wrapped for protection in transit 6 Place two of the four plastic foam spacers into the outside box so that they will support the ends of the inner box longest sides uppermost 7 Carefully place ...

Страница 11: ... outside the European Union EU Dovetail bracket fitted to the crosshead Appropriate mains cable Allen key for crosshead dovetail Four rubber feet four attachment screws and Allen key if necessary If you have any feedback regarding Mecmesin its products and services which you would like to share with us please contact us at f fe ee ed db ba ac ck k m me ec cm me es si in n c co om m page 9 ...

Страница 12: ... 1403 799979 f 44 0 1403 799975 Service Calibration t 44 0 1403 799920 f 44 0 1403 799925 i www mecmesin com e info mecmesin com Force and Torque Test Solutions DEALER STAMP 431 196 02 S I Instruments 256 South Rd Hilton South Australia 5033 Ph 08 8352 5511 info si instruments com www si instruments com ...

Отзывы: