Page 7 - 8
TA1EH
7. Standard Operating Procedures
(2)
To Lower the Skip
(3)
To Elevate the Skip
(4)
To Return to the Travelling Position
PROCEDURE
1.
When the load has been discharged.
2.
Move the control lever towards the back of the machine.
3.
The skip will lower.
PROCEDURE
1.
Position the machine where required.
2.
Make sure the area is clear of bystanders.
3.
Push the control lever to the right (away from the operator); the lift arm and skip will raise
up.
PROCEDURE
1.
Move the control lever to the left (towards the operator).
2.
The lift arm and skip will lower.
b
WARNING
Never attempt to move the machine with the lift arm and skip in the elevated position. Danger of
overturning.
Содержание TA1EH
Страница 14: ...Page 1 8 TA1EH 1 Introduction ...
Страница 37: ...Page 3 6 TA1EH 3 Technical Data ...
Страница 55: ...Page 4 18 TA1EH 4 Description Figure 4 24 Green Beacon Seat Belt Warning ...
Страница 71: ...Page 7 10 TA1EH 7 Standard Operating Procedures ...
Страница 75: ...Page 8 4 TA1EH 8 Emergency Operating Procedures ...
Страница 93: ...Page 9 18 TA1EH 9 Maintenance Lubrication ...
Страница 97: ...Page 11 2 TA1EH 11 Recovery ...
Страница 104: ...Page 13 2 TA1 0EH 13 Glossary of Terms ...
Страница 105: ...TA1EH Appendices 1 Appendices Appendix 1 Hydraulic Diagrams ...
Страница 108: ...Appendices 4 TA1EH Appendices ...
Страница 111: ......