![Mec 5492RT Скачать руководство пользователя страница 48](http://html1.mh-extra.com/html/mec/5492rt/5492rt_operators-manual_1758677048.webp)
Page 44
92RT Scssor Lfts - Operator’s Manual
July 2020
Secton 14 - Transport and Lftng Instructons
Transport and Lifting Instructions
Safety Information
This section is provided for reference and does not supersede any
government or company policy regarding the loading, transport or lifting
of MEC machinery�����
Drivers are responsible for loading and securing machines, and should
be properly trained and authorized to operate MEC machinery����� Drivers
are also responsible for selecting the correct and appropriate trailer
according to government regulations and company policy����� Drivers must
ensure that the vehicle and chains are strong enough to hold the weight
of the machine (see the serial number plate for machine weight)�����
Loading
Free-wheel configuration for Winching or Towing
Prior to manually releasing brakes, be sure the wheels are chocked to
prevent machine from moving�����
RUNAWAY HAZARD!
After releasing the brakes there is nothing to stop machine travel�����
Machine will roll freely on slopes�����
DISENGAGED
ENGAGED
ART_2848
The machine can be winched or towed short distances at speeds not to
exceed 5 MPH (8.05 kph). Before towing or winching the machine, it is
necessary to release the brakes. Reset the brakes after towing or winching.
Disengage Brakes before Towing or Winching
Chock the wheels.
Remove the Torque Engage Cap and reinstall with the bump facing
inward on all four (4) hubs.
Engage Brakes before Driving
Remove the Torque Engage Cap and reinstall with the bump facing
outward on all four (4) hubs.
•
•
•