“SE
Series
” Service and Parts Manual
March
201
7
S
TOWING
T
HE
M
AINTENANCE
L
OCKS
BOTH Maintenance Locks must be stowed
before lowering the platform
DO NOT attempt to lower the platform with
one maintenance lock in place.
1. Raise the platform approximately 1 ft / .3 m up
so that the Maintenance Locks clear the
scissor link cross tubes.
2. Slide the ladder-end Maintenance Lock to the
side and rotate it stowed position.
Use the machine entry ladder to reach the
rear Maintenance Lock.
3. Slide the front-end Maintenance Lock to the
side and rotate it stowed position.
4. Lower the platform.
Keep clear of the scissor linkage when lowering.
If a Maintenance Lock requires adjustment to
stow it correctly, stop the lowering function.
Adjust the maintenance lock while stationary,
then return to the lowering function.
ART_5146
Maintenance Locks
ART_5147
Maintenance Locks
Stowed
Stowed
Содержание 1930SE
Страница 23: ... SE Series Service and Parts Manual March 2017 NOTES ...
Страница 39: ...March 2017 Page 1 16 SE Series Parts Section NOTES ...
Страница 55: ... SE Series Service and Parts Manual March 2017 Page 2 16 NOTES ...
Страница 102: ...March 2017 Page A 34 SE Series Parts Section Motor Controller 1930SE SE Series ART_5197 ...
Страница 106: ...March 2017 Page A 38 SE Series Parts Section Limit Switch Assembly SE Series ART_5106 1 10 8 9 11 7 12 6 5 3 2 4 ...
Страница 108: ...March 2017 Page A 40 SE Series Parts Section Pipe Bracket Assembly SE Series ART_5107 1 2 3 4 5 6 7 8 ...
Страница 110: ...March 2017 Page A 42 SE Series Parts Section Ground Control Assembly 1930SE SE Series ART_5199 1 2 3 4 5 6 7 8 ...
Страница 114: ...March 2017 Page A 46 SE Series Parts Section NOTES ...
Страница 116: ...March 2017 Page B 2 SE Series Parts Section Scissor Installation SE Series ART_5275 4 5 6 7 3 2 10 9 8 1 ...
Страница 118: ...March 2017 Page B 4 SE Series Parts Section Scissor Assembly 1930SE SE Series ART_5258 ...
Страница 128: ...March 2017 Page B 14 SE Series Parts Section NOTES ...
Страница 130: ...March 2017 Page C 2 SE Series Parts Section Platform Installation SE Series ART_5269 1 2 3 4 5 6 ...
Страница 150: ...March 2017 Page C 22 SE Series Parts Section Platform Extension Lock SE Series ART_5046 8 7 4 3 2 1 6 5 ...
Страница 152: ...March 2017 Page C 24 SE Series Parts Section Platform Controls SE Series ART_5115 8 2 3 10 9 6 7 5 4 1 ...
Страница 154: ...March 2017 Page C 26 SE Series Parts Section NOTES ...
Страница 156: ...March 2017 Page D 2 SE Series Parts Section Lower Lift Cylinder Assembly SE Series ART_5285 ...
Страница 168: ...March 2017 Page D 14 SE Series Parts Section Functions Manifold SE Series ART_5277 1 2 3 4 5 6 7 ...
Страница 170: ...March 2017 Page D 16 SE Series Parts Section NOTES ...
Страница 178: ...March 2017 Page E 7 SE Series Parts Section NOTES ...
Страница 188: ...March 2017 Page F 10 SE Series Parts Section NOTES ...
Страница 193: ...NOTES ...