Warning: please use the screws provided with this product only.
Follow these steps when installing a second battery pack:
1. Remove the three screws on the stem, as shown.
Then remove the cover near the charge port.
2. Install the rail with the M4 (10mm) screws (3pcs),
provided with this product. Please make sure it is
properly fixed.
3. Install the external battery on the rail and fix it with the M4 (20mm)
screws (2pcs), provided with this product. After they are properly
installed, block the screw holes with the rubber stopper.
12
Installing
a
Second
Battery
Pack
(may
sold
seperately)
4.
Verify
that
your
Mearth
Scooter
powers
on
and
off.
Содержание X Pro 2020
Страница 1: ...Mearth X PRO User Manual 2020 2022 ...