MCZ Veld Скачать руководство пользователя страница 16

Chapter 4

 

USE AND MAINTENANCE MANUAL 

page

 16  

 

Installation and assembly 

Technical dept. - All rights reserved by MCZ GROUP S.p.A. - Reproduction 

prohibited 

 

The stove must always be handled vertically and only with trolleys. Pay 

special attention to the door and its glazing, to protect them from 

mechanical knocks which would compromise their good working order. 
In all cases, appliances must be handled with care. If possible, unwrap 

the stove near the chosen place of installation. 
The materials making up the packaging are neither toxic nor harmful, 

and so require no particular disposal measures. 
Storage, disposal or any recycling is under the responsibility of the end 

user in compliance with the applicable laws in force. 
 

4.2. 

 

FOOT ASSEMBLY AND ADJUSTMENT 

Some models envisage the assembly of support feet, designed to level 

the stove so that it is aligned and stable on the floor. The feet are 

screwed into the base of the structure, and they can be installed as 

illustrated in the figure and adjusted with a screwdriver, inserting it into 

the tip of the feet. 

 

4.3. 

 

CERAMIC CLADDING ASSEMBLY 

The installation of the ceramic parts does not present any particular 

difficulties: 

Ceramic on ash tray: 

 

1.

 

Remove lever 

“A” 

as follows: 

remove the black cap at the top of the lever, you will find a 

screw inside it; loosen it and remove the lever 

“A”.

 

2.

 

Remove the brackets 

“B”,

 insert the ceramic part 

“D”

 onto the 

hook of air adjustment lever 

“A”

 and screw the brackets 

“B”

 

back on to secure the ceramic in place. 

 

Ceramic on front panel “E”: 

 

1.

 

Loosen the two brackets 

“C”

 (left and right) and insert the 

ceramic front panel 

“E” from the top down.

 

 
You can now 

fit the ceramic sides on

 

1.

 

Take the side 

“F”

 fitting the pins featured on the side into the 

corresponding slots featured at the bottom of the stove 

structure. At the top of the ceramic panel, secure the side to 

the structure using two screws. Repeat the same steps with the 

side 

G

 and with sides 

H-I

 

Ceramic top assembly: 

1.

 

Rest the cover 

“L”

 onto the purpose-provided rubber pads 

featured on the stove casing. 
 

Содержание Veld

Страница 1: ...0 USE AND INSTALLATION MANUAL EN NuTech Renewables Ltd Unit 11 Warrenpoint Enterprise Centre Newry Road Warrenpoint Co Down BT34 3LA Tel 44 28 417 53031 Email info nutechrenewables com www NuTechrenew...

Страница 2: ...LUE PIPE 10 2 6 1 Flue pipe examples 11 2 7 CHIMNEY 12 3 DIMENSIONS AND TECHNICAL SPECIFICATIONS 13 3 1 VELD STOVE 13 3 1 1 Technical specifications 14 4 INSTALLATION AND ASSEMBLY 15 4 1 PREPARATION A...

Страница 3: ...in the event of faults or if in doubt please contact your retailer who will provide all the necessary assistance Document revisions In order to improve the product and to update this document the Manu...

Страница 4: ...ilation ducts If Oyster technology is not implemented Avoid having several operational flue ducts in the room or the proximity of a stair well and make sure that there are no appliances in adjacent co...

Страница 5: ...tly or indirectly be caused to property or personal injury or harm to animals ensuing from failure to observe all the instructions provided herein and specifically concerning the warnings regarding in...

Страница 6: ...al air inlet and that they are not used as a bedroom or bathroom or where there is no fire hazard such as garages timber storerooms warehouses of flammable materials observing under all circumstances...

Страница 7: ...stove in rooms with an explosive atmosphere The floor of the room where the stove is installed must be suitably sized to withstand its weight 2 2 1 Safe distances If particularly delicate objects are...

Страница 8: ...oes not reduce the minimum cross section be positioned in such a way as to not be obstructed the maximum length permitted for ducting is 6 m with two 90 elbows The stove must be connected to the exter...

Страница 9: ...illes always feature an indication of the useful cross section in cm2 on one side When choosing the grille and hole size check that the useful cross section of the grille is larger or the same as the...

Страница 10: ...fibre cement pipes is forbidden The smoke pipe must not cross rooms in which it is forbidden to install combustion appliances The use of counter sloping pipes is forbidden 2 6 FLUE PIPE The flue pipe...

Страница 11: ...ngular cross section the ratio between the internal dimensions should be 1 5 The sections lengths of the flue pipe shown in the technical data table are guidelines for correct installation Any alterna...

Страница 12: ...ze Steel flue pipe chimney with internal smoke deflector cone Allows excellent smoke disposal The chimney must Have an inner section equal to that of the flue Have a working outlet section of at least...

Страница 13: ...age 13 Dimensions and technical specifications Technical dept All rights reserved by MCZ GROUP S p A Reproduction prohibited 3 DIMENSIONS AND TECHNICAL SPECIFICATIONS 3 1 VELD STOVE 218 267 5 8 0 1124...

Страница 14: ...output Min KW 3 5 Kcal 3010 Efficiency 84 7 Heatable volume m3 151 40 172 35 201 30 Recommended draught 12 Pa 0 12 mbar Smoke temperature 240 C Particulate 30 mg Nm3 13 O2 17 mg MJ Smoke outlet 15 cm...

Страница 15: ...n chamber We recommend you reposition each element correctly 4 1 PREPARATION AND UNPACKING The Veld stove is delivered with three different packagings one contains the stove figure 1 one contains the...

Страница 16: ...of the structure and they can be installed as illustrated in the figure and adjusted with a screwdriver inserting it into the tip of the feet 4 3 CERAMIC CLADDING ASSEMBLY The installation of the cera...

Страница 17: ...Chapter 4 USE AND MAINTENANCE MANUAL page 17 Installation and assembly Technical dept All rights reserved by MCZ GROUP S p A Reproduction prohibited G F SPINE H I D L E C C B A B PINS...

Страница 18: ...smoke and paint smells If necessary touch up the paint with the spray can of the dedicated colour see Stove accessories Do not stand close to the stove and as mentioned air the room The smoke and pai...

Страница 19: ...ot burn waste The gases produced by combustion resulting from the use of unsuitable fuel could damage the stove the flue pipe pollute and compromise your health 5 3 USING THE STOVE 5 3 1 FUEL LOADING...

Страница 20: ...THE RIGHT The lever turned towards the right pos 1 is designed to bring a large quantity of primary air beneath the combustion chamber fire plane to allow rapid and effective ignition of the fire Fig...

Страница 21: ...of wood Open the combustion air damper completely right hand lever Light the paper and if necessary keep the door open a few minutes until the combustion chamber and the flue pipe begin to warm up On...

Страница 22: ...to contact with hot parts In the event of poor weather conditions for the operation of the stove low pressure external temperatures not particularly harsh windy day this may lead to inverse draught i...

Страница 23: ...sable to handle the door carefully without slamming it or forcing it open or shut Since it is not a flexible element the glazing may break In addition this type of glazing does not shatter or burst an...

Страница 24: ...hich the appliance should operate correctly have been reached and consequently we recommend the use of the quantity of fuel specified in the technical tables 6 1 6 Cleaning the flue pipe We recommend...

Страница 25: ...MCZ GROUP S p A Via La Croce 8 33074 Vigonovo di Fontanafredda PN ITALY Telephone 39 0434 599599 PBX Fax 39 0434 599598 Internet www mcz it e mail mcz mcz it 8901142800 Rev 1 12 2011...

Отзывы: