IM 671 / Page 6 of 28
For panel wall and thin wall construction, it is recommended that a louver frame be used. Refer to page 8 for installation of
louver frame before continuing.
Panel wall and thin wall construction varies only slightly from
frame and brick construction Note: The center of gravity is
10
1
/
4
" (260mm) from the rear face of the wall sleeve. The wall
sleeve must be inserted into the wall at least 10
1
/
4
" (260mm)
or other support must be employed.
Support can be from a factory supplied subbase or from other
field supplied materials. Installation for this application is as
follows:
1. Clean the opening of all debris that may interfere with in-
stallation.
2. If the unit is to be supplied with a subbase, refer to page 9
for installation procedure. Install subbase before installing
cabinet/wall sleeve.
3. If the optional drain kit is to be employed, refer to page 10
before proceeding.
4. Be sure the cabinet/wall sleeve is mechanically attached to
the wall and caulked to assure a proper seal. It is recom-
mended that the louver is framed be used for this purpose
(See Figure B page 8)
5. Recess the wall sleeve so that the louver is flush with the
outside of the building. (Do not recess if using the external
drain kit - see pg. 10.)
Level cabinet wall sleeve in both directions and secure by
anchoring with appropriate fasteners (as shown in figure C
page 8), or drill additional holes as required to secure firmly.
Caution: Do not drill holes in the subbase of the cabi-
net/wall sleeve. Where a subbase is used, secure wall
sleeve to subbase with clips provided.
6. Level cabinet/wall sleeve in both directions and secure by
anchoring with appropriate fasteners (as shown in figure C
page 8), or drill additional holes as required to secure firmly.
Caution: Do not drill holes in the subbase of the cabi-
net/wall sleeve. Where a subbase is used, secure wall
Wall Sleeve Installation – Panel Wall Construction
Figure 7. Panel Wall Construction with Standard
Electrical Subbase
Figure 9. Panel Wall Installation with Hydronic Subbase
Figure 8. Panel Wall Construction with Cord Connection
Note: Standard Subbase is available in 3" (76mm) or 4" (102mm) height.
Leveling legs provide adjustment of 1" (25.4mm).
sleeve to subbase with clips provided.
7. Caulk the cabinet/wall sleeve to the wall opening on both
inside and outside perimeter. Be careful not to plug the weep
holes. Caulking should be resilient, non hardening type such
as silicone.
Floor
16"
(406mm)
17"
(406mm)
Caulk
Perimeter
Both
Indoors &
Outdoors
Outdoor
Louver
Louver Frame
Room
Cabinet
8
1
⁄
4
"
(203mm)
Wall Sleeve
Min. 2 Supports
Field Supplied
Receptacle
by Others
3" Min. (76mm)
13
3
⁄
4
"
(349mm)
16"
(406mm)
17"
(406mm)
Outdoor
Louver
Louver Frame
Room
Cabinet
8
1
⁄
4
"
(203mm)
Wall Sleeve
13
3
⁄
4
"
(349mm)
8
1
⁄
4
"
(203mm)
Hydronic
Subbase
Subbase
Side Channel
Caulk
Perimeter
Both
Indoors &
Outdoors
Power Supply Conduit
(Alternate Entry)
16"
(406mm)
17"
(406mm)
Outdoor
Louver
Louver Frame
Room
Cabinet
8
1
⁄
4
"
(203mm)
Wall Sleeve
13
3
⁄
4
"
(349mm)
Subbase Side Channel
Caulk
Perimeter
Both
Indoors &
Outdoors
Power Supply Conduit
(Alternate Entry)
Electrical Subbase
Leveling Legs w/1" Adjustment
Floor
Conduit
Содержание Suite II
Страница 25: ...IM 671 Page 25 of 28 NOTES...
Страница 26: ...IM 671 Page 26 of 28 NOTES...
Страница 27: ...IM 671 Page 27 of 28 NOTES...