A heavy-gauge, corrosion resistant cabinet/wall sleeve is provided for each unit. The cabinet/wall sleeve is either shipped in a
separate carton or shipped in a multi-pack of 15.

The standard cabinet/wall sleeve is designed to be easily in-
stalled in a variety of wall constructions.
Note: The center of gravity is 10

1

4

"

 (260mm) from the rear

face of the wall sleeve. The wall sleeve must be inserted into
the was at least 10

1

4

" (260mm) or other support must be em-

ployed.
Support can be from a factory supplied subbase or from other
field supplied materials, the wall sleeve is not intended to re-
place the lintel. Recommended installation procedures are de-
scribed below:
1.

Clean the opening of all debris that may interfere with
installation.

2.

If the unit is to be supplied with a subbase, refer to page
9 for installation procedure. Install subbase before install-
ing cabinet/wall sleeve.

3.

If the optional drain kit is to be employed refer to page 10
before proceeding.

4.

Place a thin pad of soft mortar on bottom of the opening
and slide in the cabinet/wall sleeve. Be sure to recess the
wall sleeve enough to accommodate outside louver. This
recess is 

3

8

" (9.5mm) for stamped louvers and 1

1

8

" (32mm)

for architectural louver. Louver should be flush to exterior
surface when complete. Note: Do not recess if using the
external drain kit - see pg. 10.

5.

Level cabinet /wall sleeve in both directions and secure
by anchoring with appropriate fasteners (as shown in fig-
ure C page 8). A 

5

16

" (8mm) hole is provided on each side,

2" (51 mm) down from the top and 2" (51 mm) in from the
rear of the cabinet/wall sleeve. Additional holes may be
required to firmly secure the cabinet/wall sleeve.
Caution: Do not drill holes in the subbase of the cabi-
net/wall sleeve.
 Where a subbase is used, secure wall

Wall Sleeve Installation – Frame and Brick

Note: Standard Subbase is available in 3" (76mm) or 4" (102mm) height.

Leveling legs provide adjustment of 1" (25.4mm).

Figure 4. Frame & Brick with Standard Electric Subbase

Figure 6. Frame & Brick with Hydronic Subbase

Figure 5. Panel Wall Construction with Cord Connection

sleeve to subbase with clips provided.

6.

Caulk the cabinet/wall sleeve to the wall opening on both
inside and outside perimeter. Be careful not to plug the
weep holes. Caulking should be resilient, non hardening
type such as silicone.

Finished Floor

or Carpet

13

3

4

"

(349mm)

16"

(406mm)

3" (76mm)

17"

(406mm)

Wall Receptacle

by Others

Caulk

Perimeter

Both

Indoors &

Outdoors

Outdoor

Louver

Steel Lintel
(by Others)

Mounting

Screws

by

Installer

Finished Floor

or Top of Carpet

13

3

4

"

(349mm)

16"

(406mm)

17"

(406mm)

Power Supply
Connect
(Alternate Entry)

Caulk

Perimeter

Both

Indoors &

Outdoors

Before

Installing

Louver

Outdoor

Louver

Steel Lintel (by Others)

Mounting

Screws

by

Installer

4

3

8

"

(111mm)

Room

Cabinet

8

1

4

"

(203mm)

Leveling
Leg

See Note

Wall Sleeve

Finished Floor
or Carpet

16"

(406mm)

17"

(406mm)

Caulk

Perimeter Both

Indoors & Outdoors

Outdoor

Louver

Steel Lintel (by Others)

Mounting

Screws

by

Installer

Room

Cabinet

8

1

4

"

(203mm)

Leveling Legs w/1"
Adjustment

Hydronic Subbase

Wall Sleeve

Subbase

Side Channel

Alternate

Electrical

Connections

Hydronic
Heating Coil

8

1

4

" (203mm)

13

3

4

"

(349mm)

Содержание Suite II

Страница 1: ...Installation Maintenance Data IM 671 1 Group PTAC Part Number 059490801 Date November 2003 Suite II PTAC PTHP Conditioner 1 Motor Standard 2 Motor Premium 2003 McQuay International...

Страница 2: ...h the power supply available The Suite Series Comfort Conditioner is designed and built for through the wall installation in either new or existing buildings The self contained refrigerant sys tem del...

Страница 3: ...e SHI Suite II 1 Motor Heat Pump IAQ DEI Suite II 2 Motor IAQ SHS Suite II 1 Motor Heat Pump DES Suite II 2 Motor SEA Suite II 1 Motor Automatic Damper DHA Suite II 2 Motor Heat Pump Automatic Damper...

Страница 4: ...and units with hydronic heat See pages 5 6 7 9 for subbase dimensions Sides are adjustable 2 Opening needs to be 165 8 422mm x 425 8 1083mm when using a louver frame See page 8 Figure B of 3 76mm off...

Страница 5: ...e C page 8 A 5 16 8mm hole is provided on each side 2 51 mm down from the top and 2 51 mm in from the rear of the cabinet wall sleeve Additional holes may be required to firmly secure the cabinet wall...

Страница 6: ...he subbase of the cabi net wall sleeve Where a subbase is used secure wall sleeve to subbase with clips provided 6 Level cabinet wall sleeve in both directions and secure by anchoring with appropriate...

Страница 7: ...to se cure firmly Caution Do not drill holes in the subbase of the cabinet wall sleeve Where a subbase is used secure wall sleeve to subbase with clips provided Wall Sleeve Installation Thick Wall Con...

Страница 8: ...leeve Clean out weep holes to assure proper drainage 4 Attach indoor drain kit if used according to the instructions on page 10 Outdoor drain kits must be installed after wall sleeve is in place 5 Con...

Страница 9: ...and includes the hydronic heating coil Refer to IM Bulletin 419 for installation details In addition rough in supply and return piping Electrical and plumbing rough in can be done through the back of...

Страница 10: ...e external drain kit should be completed after the cabinet wall sleeve has been installed Note When using the external drain kit the sleeve must be flush or beynd the outside finished wall do not rece...

Страница 11: ...r 4 screws packaged with the Tinnerman clips 15 Plug electrical cord into receptacle Excess cord for 208V and 230V units should be coiled neatly and stored in the conditioner Attach plug cord cover to...

Страница 12: ...d into the receptacle During Start up applies only to standard equipment 1 Set manual ventilation damper to Open or Closed posi tion as required by owner 2 Select HIGH HEAT on the rotary switch Move t...

Страница 13: ...clean operating or low usage conditions Unit malfunction will occur if air filters are not kept clean Rinse filter with hot water and a mild detergent Let dry and oil lightly to en hance dust collect...

Страница 14: ...es on at the vari ous steps in this cycle can be a big help to the troubleshoot ing mechanic Figure 18 illustrates the refrigeration cycle The diagram shows what occurs in each component of a hermeti...

Страница 15: ...Evaporator motor slipping on motor shaft d Heat load in room exceeds capacity of equipment e Windows and doors in room are open f Compressor not pumping indicated by 1 Low wattage 2 Condenser not war...

Страница 16: ...apparent reason Inspection has revealed no loose components that might be the source of the noise Due to the action of the compressor it is possible to have internal noise develop if the refrigerant t...

Страница 17: ...IM 671 Page 17 of 28 Wiring Diagram PTAC 1 Motor Standard Manual Changeover Control Model PSEA PSEC PSEH PSEI PSES Thermostat Unit Heat Electric Changeover Manual...

Страница 18: ...IM 671 Page 18 of 28 Wiring Diagram Heat Pump 1 Motor Standard Manual Changeover Control Model PSHA PSHC PSHI PSHS Thermostat Unit Heat Electric Changeover Manual...

Страница 19: ...IM 671 Page 19 of 28 Wiring Diagram Steam Heat with Normally Closed Valve 1 Motor Standard Manual Changeover Control Model PSEC PSEH PSES Thermostat Unit Heat Steam Changeover Manual...

Страница 20: ...IM 671 Page 20 of 28 Wiring Diagram Hot Water Heat with Normally Open Valve 1 Motor Standard Manual Changeover Control Model PSEC PSEH PSES Thermostat Unit Heat Water Changeover Manual...

Страница 21: ...IM 671 Page 21 of 28 Wiring Diagram PTAC 2 Motor Standard Manual Changeover Control Model PDEA PDEC PDEH PDEI PDES PFEC PFES Thermostat Unit Heat Electric Changeover Manual...

Страница 22: ...IM 671 Page 22 of 28 Wiring Diagram Heat Pump 2 Motor Standard Manual Changeover Control Model PDHA PDHC PDHI PDHS PFHC PFHS Thermostat Unit Heat Heat Pump w Back up Electric Changeover Manual...

Страница 23: ...IM 671 Page 23 of 28 Wiring Diagram Steam Heat with Normally Closed Valve 2 Motor Standard Manual Changeover Control Model PDEC PDEH PDES PFEC PFES Thermostat Unit Heat Steam Changeover Manual...

Страница 24: ...IM 671 Page 24 of 28 Wiring Diagram Hot Water Heat with Normally Open Valve 2 Motor Standard Manual Changeover Control Model PDEH PDES PFEC PFES Thermostat Unit Heat Water Changeover Manual...

Страница 25: ...IM 671 Page 25 of 28 NOTES...

Страница 26: ...IM 671 Page 26 of 28 NOTES...

Страница 27: ...IM 671 Page 27 of 28 NOTES...

Страница 28: ...International www mcquay com 800 432 1342 IM 671 Rev 11 03 This document contains the most current product information as of this printing For the most up to date product information please go to www...

Отзывы: