1-12
(g) Unit Conversion
In the case of converting standard unit to down
fl
ow unit, follow the steps as stated below:
5RT90/120/150/180BR
Step 1
Step 2
Step 4
Step 3
Remove the side panel
Remove the Pulley Belt
Detached the
blower support
Detached blower
Remove screws
at both sides
For 5RT90BR:
The two side plates are screwed
on the blower support as shown
For 5RT120/150/180BR:
The two down
fl
ow structure
are screwed to blower
Cover the
horizontal supply
opening with the
blower support that
detached from the
blower.
Turn the blower to face bottom.
Screw at both sides.
Install back
the pulley
belt. Adjust
the belt
tension by
moving the
motor base.
Cover the horizontal
return opening with the
cover and screw tightly
Unscrew the vertical
return cover from the
base panel
Remove the side
panel at return side
Lastly, install back the side panel.
Install back the pulley belt. Adjust the belt tension.
Lastly, install back the side panel.
Note:
For down
fl
ow conversion, belt length will need to
be changed.
For unit with standard pulley, belt length
= a mm
Shaft to shaft Distance for down
fl
ow, C-C = b mm
5RT90BR
5RT120BR
5RT150BR
5RT180BR
a
1120
1180
1150
1362
b
380
410
380
460
IM 1 5RTBR-1209(0)-EN.indd 12
IM 1 5RTBR-1209(0)-EN.indd 12
1/14/10 11:37:22 AM
1/14/10 11:37:22 AM
Содержание ROOFTOP R08019034483
Страница 2: ......
Страница 22: ...6 8 1 1 OFF R410A 1 1975 1...
Страница 23: ...6 9 a b...
Страница 25: ...6 11 f a b c 5RT90BR d 4 4 5RT90BR e 1 4 3000 1200 1200 1200 A B C A 70 B 2C C 2 X...
Страница 32: ...6 18 40 C 2 5RT90BR i ii R410A iii iv R410A R410A R410A R410A R410A R410A...
Страница 33: ...6 19 ON OFF 3 3 5RT90BR 5RT120 150 180BR...
Страница 34: ...6 20...