5 - 3
Hot Tap Operation
Open Ball Valve or Remove Squeeze Tool
Allow the fused service line connection to cool.
Open the ball valve or remove the squeeze tool to allow the
service line to pressurize.
TX01157-11-18-96
Complete Service Line
Make fusion to complete the service line.
TX01156-10-02-17
Prepare Tool For Next Tap
Remove coupon from cutter using a long handled screwdriver.
Cutter edges are very sharp. Avoid injury by
avoiding direct contact with the cutter.
TX01158-10-02-17
PH00
99
6-11-19-9
6
PH00
99
9-11-19-9
6
PH00
99
8-11-19-9
6
Содержание 220002
Страница 1: ...Manual 224901 Revision T 10 18 2 3 4 6 63mm 90mm 110mm 125mm 160mm Hot Tap Tools Operator s Manual...
Страница 18: ......
Страница 20: ......