background image

Page

22

VLL726BL

VLL726BL

½ PEDESTAL BASE

VLL726BL

FULL BASE

Содержание VLL726BL

Страница 1: ...Y CASE FACILITY VLL726E VLL726BL VLL727BL VSS726E VVS727E REFRIGERATED DISPLAY CABINETS ENHANCED MODELS INSTALLATION AND MAINTENANCE INSTRUCTIONS MAN147 1 April 2013 VLL726E VLL727BL VSS726E VVS727E V...

Страница 2: ...NG THE FRONT BUMPER ADJUSTING FRONT GLASS ELECTRICAL INSTALLATION DRAIN INSTALLATION PRE START CHECK LIST CABINET OPERATION 13 LOADING LIMITS FITTINGS AND ACCESSORIES TEMPERATURE CHECKING MAINTENANCE...

Страница 3: ...ance of the cabinet and higher running costs LOCATION CONDITIONS Cabinets should be sited so that external influences are minimized Situations to avoid are Air draughts from Air conditioning Ventilati...

Страница 4: ...ge to some components in the cabinet RECEIVING CABINETS Cabinets will always be dispatched in good condition Always inspect the cabinet and packaged accessories for damage Note any damage on the carri...

Страница 5: ...ce the next cabinet as close as possible to first cabinet and set the height of the second cabinet to roughly match the first following the procedures in steps 3 4 and 5 7 Push the cases together and...

Страница 6: ...ions for the fitting of these will be supplied with each kit Contact Hussmann for kit options and instructions ATTACHING THE FRONT BUMPER IMPORTANT Bumper assembly securing screws must be fitted to al...

Страница 7: ...olour panel painted panel that sits at 45 fit the bumper assembly 3 Align the bottom groove in the aluminium extrusion with the bottom tag on the plastic clips 4 Push the top of the bumper assembly on...

Страница 8: ...ce once the assembly has been fitted This can be done using your fingers from below the assembly 5 Pre drill the bumper assembly aluminium extrusion at every white plastic bumper clip with a 4 5mm dri...

Страница 9: ...ge 9 6 Fit hex head securing screws to every white plastic bumper clip It is advised that the screws provided are used to ensure secure fixing 7 Front colour panels can now be fitted USE SCREWS PROVID...

Страница 10: ...head screwdriver Philips PH2 Square drive screw driver S2 Star drive keys Allen keys Adjustable wrench Adjusting the rear posts 1 Remove the screws on the rear work top Taking care not to damage the t...

Страница 11: ...moved laterally to even out the gaps between each piece of glass 2 Lift the glass to the fully open position 3 Loosen the grub screw on the locking plates at each hinge Hinge attachment screws Locking...

Страница 12: ...nsulating to prevent condensation dripping onto the floor PRE START CHECK LIST It is suggested that the following items be included but not limited to any pre start check of this cabinet All electrica...

Страница 13: ...d be between 1 C and 5 C These cabinets have a load limit of 100mm above the storage surface Product shall be kept at least 20mm below the bottom of the air delivery vents Food products stored within...

Страница 14: ...Page 14 VSS726E VSS726E cabinets are available with curved or straight front glass TOP OF PRODUCT 20mm BELOW AIR DELIVERY VENTS 100mm PRODUCT DEPTH PRODUCT SHALL BE 50mm BELOW PRODUCT STOP...

Страница 15: ...introduced to the cabinet Ice should not be stacked more than 20mm above the Ice tray Product should be at least 20mm below the rear air delivery vents ICE LOAD LIMIT 20mm ABOVE ICE TRAY PRODUCT HEIGH...

Страница 16: ...limit of 100mm above the shelves and the deck rack Food products stored within the load limits are properly refrigerated Food products stored outside the load limits may not be properly refrigerated t...

Страница 17: ...ank ice against them to hold in place It is very important that the patch end ice stops are fitted They prevent condensation from forming on the outside of the cabinet VVS727E fittings and accessories...

Страница 18: ...8 TEMPERATURE CHECKING The air delivery temperature in this case should be checked at least once a day The temperature should be below 1 C Checking should be done systematically and the temperature re...

Страница 19: ...to dilute the liquid spill until the first opportunity for a deep clean to be carried out Cleaning instructions can be found on the rear of case IMPORTANT Always isolate the cabinet from the mains po...

Страница 20: ...he maintenance check should include Leak testing of the cabinet refrigerant circuit Ensuring no damage has occurred to any electrical components Cleaning the evaporator coil Particular attention shoul...

Страница 21: ...Page 21 CABINET SECTIONAL VIEW VLL726E VLL726E PEDESTAL BASE VLL726E FULL BASE...

Страница 22: ...Page 22 VLL726BL VLL726BL PEDESTAL BASE VLL726BL FULL BASE...

Страница 23: ...Page 23 VSS726E VSS726E PEDESTAL BASE VSS726E FULL BASE VSS726E cabinets are available with curved or straight front glass Curved glass cabinet VSS726E Straight glass cabinet VSS726B...

Страница 24: ...Page 24 VVS727E VVS727E PEDESTAL VVS727E FULL BASE VVS726E cabinets are available with curved or straight front glass Curved glass cabinet VVS727E Straight glass cabinet VVS727B...

Страница 25: ...Page 25 VLL727BL VLL727BL PEDESTAL BASE VLL727BL FULL BASE...

Страница 26: ...Page 26 CABINET JOINING DIAGRAMS VLL726E VLL726BL and VLL727BL USE THE SAME FIXING POINTS...

Страница 27: ...Page 27 VSS726E...

Страница 28: ...Page 28 VVS727E...

Страница 29: ...Page 29 CABINET FOOTPRINT VLL726E VSS726E Frame Base 938mm 1 5 1250mm 2 1875mm 3 2500mm 4 3750mm 6...

Страница 30: ...Page 30 VLL726E VSS726E Half Pedestal Base 938mm 1 5 1250mm 2 1875mm 3 2500mm 4 3750mm 6...

Страница 31: ...Page 31 VVS727E VLL727BL VLL726BL Full Base 1250mm 2 1875mm 3 2500mm 4 3750mm 6...

Страница 32: ...Page 32 VVS727E VLL727BL VLL726BL Half Pedestal Base 1250mm 2 1875mm 3 2500mm 4 3750mm 6...

Страница 33: ...s Glass Breakage Operating Staff Installation Technician Glass in eyes Scratches Fright Unlikely Low Do not over stress glass or hit with objects Glass replacement Service Technician Strains and sprai...

Отзывы: