background image

- 15 -

Right Blade and Gearbox Assembly

Содержание MK8-120

Страница 1: ...262 644 5169 Email mbw mbw com Website www mbw com MBW UK Ltd Units 2 3 Cochrane Street Bolton BL3 6BN England Phone 01204 387784 Fax 01204 387797 L18256 09 04 A MBW Inc 2004 Printed in the USA MK8 1...

Страница 2: ...intenance 6 Engine Speed 6 Cleaning 6 Reduction Gear Oil 6 Lifting 7 Storage 7 Changing Trowel Blades 7 Replacing The Battery 8 Replacing The Belts 8 Replacing The Floats 8 Service 9 Torque Chart 9 Pa...

Страница 3: ...CALIFORNIA PROPOSITION 65 WARNING Engine exhaust and some of its constituents are known in the state of California to cause cancer birth defects and other reproductive harm WARNING...

Страница 4: ...evere electrical shocks Avoid contacting these units or their wiring SAFE DRESS Do not wear loose clothing rings wristwatches etc near machinery NOISE PROTECTION Wear OSHA specified hearing protection...

Страница 5: ...n enclosed area The engine produces carbon monoxide a POISONOUS GAS UNLEADED GASOLINE 17892 OPERATING INSTRUCTIONS 1 READ OWNER S MANUAL before attempting to start or operate this machine 2 Check engi...

Страница 6: ...ensions 96 5 x 47 4 x 41in 2450x1205x1040mm Weight 661lbs 300kg Motor Briggs 31HP Kohler 27HP Max Engine RPM 3600 RPM Min Max Blade RPM 70 125 RPM Rotor Diameter 47 2in 1200mm Max Forward Speed 295 ft...

Страница 7: ...if necessary Starting Engine 1 Close the choke Choking may not be necessary on warm engines 2 Leave accelerator pedal at idle 3 Hold one emergency stop lever closed and turn the start key 4 Open the c...

Страница 8: ...e the start key from the engine Stopping in emergency conditions The safety stop levers are connected to two micro switches which cut the electric power to the engine in case of an emergency immediate...

Страница 9: ...rnor settings The governor establishes safe operating limits that must not be exceeded Cleaning Clean the float machine at the end of each working day to prevent the cement from hardening on the machi...

Страница 10: ...he fuel vapors might come into contact with flames and or sparks If you know that the machine will not be used for more than one month drain the fuel from the tank in order to prevent the formation of...

Страница 11: ...e replacement belts onto the clutch one at a time and roll them into there respective groove on the input sheave Repeat this process for the remaining two belts 2 Tighten tensioner bolt against idler...

Страница 12: ...26 ft lbs 37 ft lbs 7 16 14 24 ft lbs 37 ft lbs 52 ft lbs 7 16 20 27 ft lbs 41 ft lbs 58 ft lbs 1 2 13 37 ft lbs 57 ft lbs 80 ft lbs 1 2 20 41 ft lbs 64 ft lbs 90 ft lbs 9 16 12 53 ft lbs 82 ft lbs 1...

Страница 13: ...ck in all areas of the country Their sales engineers are available for professional consultation If you cannot locate an MBW distributor in your area contact MBW or one of our Sales Branches listed be...

Страница 14: ...11 Main Assembly...

Страница 15: ...12 Tank Assemblies...

Страница 16: ...13 Control Assembly...

Страница 17: ...14 Drive Assembly...

Страница 18: ...15 Right Blade and Gearbox Assembly...

Страница 19: ...16 Left Blade and Gearbox Assembly...

Страница 20: ...17 Engine Assembly Kohler Heavy Duty Clutch...

Страница 21: ...18 Engine Assembly Briggs...

Страница 22: ...19 Frame Assembly...

Страница 23: ...20 Accessories 18260 18027 Lifting Sling Cart...

Страница 24: ...for the return of merchandise under warranty must be obtained from MBW or MBW UK Limited 7 MBW reserves the right to inspect and render final decision on each warranty case 8 MBW reserves the right t...

Отзывы: