background image

657/01 Page 1 Black 

PMS Pro. Blue

Power Trowel

Hire Shops

For troweling large areas of concrete
screed in a sixth of the time it would

take by hand.

Operating & Safety Guide 657

To do this, 

turn the adjuster knob clockwise to

increase, anticlockwise to decrease.

Gently

increase the engine speed until the blades

are rotating at a speed suitable for the job 

and

comfortable for you.

Take your time and don’t overdo it.

You are more

likely to have an accident if you are tired or rushing.

In an emergency, 

and if you have no other option,

release the handlebar and step back. 

The engine will

automatically cut out.

If it is necessary, 

the blades can be taken in up to 1/8”

to the edge of a wall

without having to finish off by

hand. 

Loosen the two wing nuts retaining the

movable guard, raise the guard clear and re-tighten.

Final smoothing can be achieved with the blades
fitted, 

but 

for the best result, use a disk finisher.

Available for hire from your local HSS Hire Shop.

To fit the disk, set the blade pitch to minimum, then place
the unit centrally over the disk allowing the front edge of
the blade to engage with the lip on the top of the disk. The
disk will be held in place by the movement of the blades.

Never push the equipment beyond its design
limits.

If it will not do what you want with reasonable

ease, assume you have the wrong type of equipment for
the job. Ask at your local HSS Hire Shop for advice.

EQUIPMENT CARE

Keep the equipment clean

. You will find this less of a

chore if you clean up regularly rather than wait until the
end of the hire.

When not in use

, store the equipment somewhere

clean, dry and safe

from thieves.

Keep the engine upright at all times

. If it should be

tipped over, mop up oil and fuel spillages and contact
your local HSS Hire Shop for advice.

Regularly check the engines fuel level and top up
as required

using the correct fuel: lead-free petrol.

Check the engine oil level daily

. Let the engine cool,

stand it on level ground, withdraw the dip stick and wipe
clean, replace and withdraw a second time to verify that
the oil level is between Min and Max. Top up as required.

Set the throttle to idle, then switch the engine OFF,
followed by the fuel tap.

Give the unit a final clean up ready for return

to

your local HSS Hire Shop.

FINISHING OFF

Code 44216 / 44229

©HSS Hire Service Group Plc 1998 No. 657/01

Group Office: 25 Willow Lane, Mitcham, Surrey CR4 4TS

Web Site: http://www.hss.co.uk

Contact your local

0990 282828

…any comments?

If you have any suggestions to enable us to improve

the information within this guide please fax your

comments or write to the Product Manager at the

address below  

Fax: 0181-687 5001

Wall

Movable

Guard

Close Work

Отзывы: