![MBRAUN MB 120B-G Скачать руководство пользователя страница 17](http://html1.mh-extra.com/html/mbraun/mb-120b-g/mb-120b-g_operating-instructions-manual_1752775017.webp)
Equipment for working gas connections
Pressure reducing valve for working gas
Supply piping for working gas
Equipment for regeneration gas connections
Pressure reducing valve for regeneration gas
Supply piping for regeneration gas
Working gas pressure control system
200 bar primary, 5
.
5 to 6 bar secondary
9 mm dia. hose nozzle or 10 mm dia. Swagelok
©
screwed fitting
Use:
Material:
Connection type:
Connecting the working gas source with the “Working Gas INLET” system connection
Optional (length as required):
either:
9 mm dia. reinforced hose, 3 mm wall thickness and adapter, 9 mm dia. hose
nozzle with 10 mm dia. Swagelok
©
screwed fitting
or:
10 mm dia. copper pipe and 10 mm dia. Swagelok
©
screwed fitting
or:
10 mm dia. stainless steel pipe and 10 mm dia. Swagelok
©
screwed fitting
9 mm dia. hose nozzle or 10 mm dia. Swagelok
©
screwed fitting
Use:
Material:
Connection type:
Regeneration gas pressure control system
Connecting the regeneration gas source with the “Regeneration gas INLET” system connection
Optional (length as required):
either:
9 mm dia. reinforced hose, 3 mm wall thickness and adapter, 9 mm dia. hose
nozzle with 10 mm dia. Swagelok
©
screwed fitting
or:
10 mm dia. copper pipe and 10 mm dia. Swagelok
©
screwed fitting
or:
10 mm dia. stainless steel pipe and 10 mm dia. Swagelok
©
screwed fitting
9 mm dia. hose nozzle or 10 mm dia. Swagelok
©
screwed fitting
Use:
Material:
Connection type:
200 bar primary, 0.3 - 0.4 bar secondary
9 mm dia. hose nozzle or 10 mm dia. Swagelok
©
screwed fitting
Use:
Material:
Connection type:
Chapter 3
Preparing the Connections
18
Содержание MB 120B-G
Страница 6: ...OPERATING INSTRUCTIONS Chapter 1 General Information MBRAUN 1...
Страница 10: ...OPERATING INSTRUCTIONS Chapter 2 Transport Site Selection Modification MBRAUN 2...
Страница 13: ......
Страница 14: ...OPERATING INSTRUCTIONS Chapter 3 Preparing the Connections MBRAUN 3...
Страница 20: ...OPERATING INSTRUCTIONS Chapter 4 Installation MBRAUN 4...
Страница 24: ...OPERATING INSTRUCTIONS Chapter 5 Activating and Deactivating the System MBRAUN 5...
Страница 28: ...OPERATING INSTRUCTIONS Chapter 6 OP 17 Operation Panel MBRAUN 6...
Страница 32: ...OPERATING INSTRUCTIONS Chapter 7 Purging the System MBRAUN 7...
Страница 36: ...OPERATING INSTRUCTIONS Chapter 8 Pressure Control System MBRAUN 8...
Страница 40: ...OPERATING INSTRUCTIONS Chapter 9 Circulation Mode MBRAUN 9...
Страница 45: ......
Страница 46: ...OPERATING INSTRUCTIONS Chapter 10 Regeneration MBRAUN 10...
Страница 51: ......
Страница 52: ...OPERATING INSTRUCTIONS Chapter 11 Settings and Display Patterns MBRAUN 11...
Страница 59: ......
Страница 60: ...OPERATING INSTRUCTIONS Chapter 12 Antechamber Operation MBRAUN 12...
Страница 73: ......
Страница 74: ...OPERATING INSTRUCTIONS Chapter 13 Dust Filters MBRAUN 13...
Страница 77: ......
Страница 78: ...OPERATING INSTRUCTIONS Chapter 14 Analyzers MBRAUN 14...
Страница 90: ...OPERATING INSTRUCTIONS Chapter 15 Maintenance and Service MBRAUN 15...
Страница 94: ...OPERATING INSTRUCTIONS Chapter 16 Spare Parts List MBRAUN 16...
Страница 103: ......
Страница 105: ......