45
8. Relocation or Disposal
8-1 : Relocation
8-1-1 :
Removal of the machine from its present location
▪
Turn off the power switch.
▪
R
emove the power plug from the wall outlet.
▪
Lower the auxiliary table.
▪
Raise the paper ejection table and put it on the paper feed table, and hang it on the pin.
8-1-2 : Transport
▪
Transport the removed parts, attachments and Operation Manual together with the machine.
▪
Do
not to expose the machine to strong vibration or shock.
▪
Ensure that the machine is carried by two persons wearing protective gloves, holding the four corners of
the machine base firmly.
8-1-3 : Installation
When installing the machine at its new location, observe the same procedure as when first installing it. (Refer to
“4. Preparation.”)
8-2 : Disposal
When disposing of the machine, ask a contractor specialized in industrial waste disposal to handle it in accordance
with the local regulations.
https://www.supplychimp.com
Содержание 408A
Страница 2: ...2 https www supplychimp com ...
Страница 47: ...47 MEMO https www supplychimp com ...
Страница 48: ...48 MBM Corporation https www supplychimp com ...