EM SuperLok
Field Seaming Tool Manual
®
CRIMPING ARM
(UP POSITION)
LOCKING ARM
(UP POSITION)
EQUIPMENT CHECKLIST
HAND CRIMPER
(Shipped Separately)
ELECTRIC SEAMER
DO NOT PULL
DO NOT LIFT
When handling seamer tool, always use
the handles to lift or pull it.
NEVER PICK IT UP BY THE LOCKING
ARM OR PULL IT BY THE ELECTRIC
CORD
FORMING
ARM
HANDLE
PHASE 1/PHASE 2
HAND TOOL
ERECTOR RESPONSIBILITY
This Seaming Equipment Kit was checked before shipment and found to be complete and in proper working condition. Upon
receipt of this kit, inspect for any damage that may occurred during shipment. If any damage is discovered, call MBCI immedi-
ately for instructions.
It is the erector’s responsibility to become familiar with, and operate the seaming equipment in accordance with the instructions
provided in this manual using safe construction practices. Failure to adhere to these instructions could result in damage to the
seaming equipment and/or roof panels, or injury to erection personnel.
EM SuperLok
®
Seaming Information
The seamer and the hand crimper are shipped in individual specially designed boxes accompanied by a field manual.
Read the field manu-
al thoroughly before starting the seaming operation. Failure to adhere to these instructions will result in damage to the seamer
and/or panels. The erector will be held liable for any costs incurred for replacement or repair.
Pre-Seaming Information
1. Locate field manual in the hand crimper or seamer box and review operational procedures.
2. Locate power source and check against power requirements in field manual.
3. Check seams for proper engagement.
4. Clean dirt, debris and excess sealant from seams and panel surfaces to avoid interfering with the seaming operation.
5. Panels must be hand crimped at each clip and endlap as they are installed to prevent their separation by a strong wind. Panels
should be seamed with electric seaming tool as soon as possible after installation.