11
10. The dryer
must be
installed with provisions for adequate combustion and make-up air supply.
CAUTION:
This dryer produces combustible lint and
must be
exhausted to the outdoors. Every 6
months, inspect the exhaust ducting and remove any lint build up.
IMPORTANT: Dryer must be installed in a location/environment, which the ambient
temperature remains between 40° F (4.44° C) and 130° F (54.44° C)
.
B. UNPACKING/SETTING UP
Remove protective shipping material (i.e., plastic wrap, and/or optional shipping box) from dryer.
IMPORTANT:
Dryer
must be
transported and handled in an upright position at
ALL
times.
The dryer can be moved to its final location while still attached to the skid or with the skid removed. To unskid
the dryer, locate and remove the four (4) bolts securing the base of the dryer to the wooden skid. Two (2) are
at the rear base (remove the back panel for access), and two (2) are located in the bottom of the lint chamber.
To remove the two (2) bolts located in the lint chamber area, remove the lint door.
1.
Leveling Dryer
a. To level dryer, place 4-inch (10.16 cm) square metal shims (refer to
the
illustration
) or other suitable material under the base pads. It is
suggested that the dryer be tilted slightly to the rear.
The lint coops of
ALL
MDG76PC dryers are supported during shipping by a
bracket.
REMOVE THIS BRACKET BEFORE STARTING THE DRYER.
If more headroom is needed when moving dryer into position, the top console
(module) may be removed.
2. To Remove Top Console (Module)
a. Remove the four (4) nuts as shown in the
illustration
.
b. Remove the two (2) hex head self-taping screws on
the control box, also disconnect the connector in the
control box (refer to the
illustration
).