background image

SYSTEM OPERATION

25

• 

The gas valve is de-energized.

• 

The inducer remains energized for the post purge 

period (15 seconds).

• 

The indoor blower runs for the selected off delay period 

(90 seconds by default, adjustable from 30 – 180 

seconds).

Heating Mode Speed Selection

To change the main blower speed in HEATING mode, follow 

the following steps:

1.  Press left or right button till LED displays “gA1 “(for 

single stage HEATING). Press center button and LED 

will display the selected speed number as Fxx (xx: 

Blower speed number).

2.  The control shall rotate available speed number ev-

ery time Left/Right switches are pressed. Table be-

low shows the available speeds for Low & High heat 

mode.   

3.  When the center switch is pressed, the current dis-

played speed shall be selected, and control shall ap-

ply the newly selected speed in next heating call.

NOTE: 

Always refer to the Heating Chart to choose from 

available heating speeds

 

 

THERMOSTAT CALL 

AVAILABLE SPEEDS 

 

 

W/W1 

F01

 

 

 

F03

 

 

F04

 

 

 

F02 (DEFAULT)

 

 

 
 

 

Heating Speed Table for 1 Stage IFC

Continuous Fan Mode Speed Selection

To change the main blower speed in circulation mode, follow 

the following steps:

1.  Press the left or right switch until LED displays “FSd”. 

Press the center switch and LED will display the select-

ed speed number as Fxx (xx: Blower speed number 

from 1 to 9). F01 is the default speed for circulation.

2.  The control will rotate available speed number every 

time left/right switches are pressed. All 9 speeds are 

available for circulation. 

3.  When the center switch is pressed, the current dis-

played speed will be selected, and control will imme-

diately apply that speed setting. 

 

THERMOSTAT 

CALL 

AVAILABLE 

SPEEDS 

 

 

F01

 

 

F02 

 

F03

 

(DEFAULT)

 

 

F04 

 

F05 

 

F06 

 

F07 

 

F08 

 

F09 

 

 

Circulation Speed Table

Cooling Mode Sequence of Operation 

Low Stage Cooling Mode Sequence:

 

On a call for low stage cooling, the Y/Y1 or Y/Y1 and G ther-

mostat contacts close signaling the furnace control board 

with 24 VAC on Y/Y1 or Y/Y1 and G terminals.

• 

The 7-Segment will display the cool mode:

1 A C

• 

The compressor and condenser fan are energized. 

• 

The circulator fan is energized at low cool speed after 

a cool on delay. The electronic air cleaner will also be 

energized. 

• 

After  the  thermostat  is  satisfied,  the  compressor  is  de-

energized  and  the  Cool  Mode  Fan  Off  Delay  period 

begins. 

• 

Following the Cool Mode Fan Off Delay period, the cool 

circulator and air cleaner relay are de-energized.  

2nd Stage Cooling Mode Sequence:

 

On a call for 2nd stage cooling, the Y2 or Y2 and G thermo-

stat contacts close signaling the furnace control board with 

24 VAC on Y2 or Y2 and G terminals. 

• 

The 7-Segment will display the cool mode: 

2 A C

• 

The compressor and condenser fan are energized. 

• 

The circulator fan is energized at cool speed after a 

cool on delay. The electronic air cleaner will also be 

energized. 

• 

After the thermostat is satisfied, the compressor is de-

energized  and  the  Cool  Mode  Fan  Off  Delay  period 

begins. 

• 

Following the Cool Mode Fan Off Delay period, the cool 

circulator and air cleaner relay are de-energized

Содержание Amana AC9S96

Страница 1: ...rovide our customers with quality products It is possible however that during its lifetime a product may require service Products should be serviced only by a qualified service technician who is familiar with the safety procedures required in the repair and who is equipped with the proper tools parts testing instruments and the appropriate service manual REVIEW ALL SERVICE INFORMATION IN THE APPRO...

Страница 2: ...line for dealers Your telephone company will bill you for the call WARNING This unit should not be connected to or used in conjunction with any devices that are not design certified for use with this unit or have not been tested and approved by the manufacturer Serious property damage or personal injury reduced unit performance and or hazardous conditions may result from the use of devices that ha...

Страница 3: ...ionner au sein de la zone confinée WARNING If the information in these instructions is not followed exactly a fire or explosion may result causing property damage personal injury or loss of life do not store or use gasoline or other flammable vapors and liquids in the vicinity of this or any other appliance WHAT TO DO IF YOU SMELL GAS Do not try to light any appliance Do not touch any electrical s...

Страница 4: ...A Brand Configuration M Upflow Horizontal Major Revision C Downflow Horizontal A Initial Release B 1st Revision Nox Motor 9 Nine Speed ECM Cabinet Width A 14 Gas Valve B 17 5 C 2 Stage C 21 S 1 STAGE D 24 5 Maximum CFM 3 1200 CFM AFUE 4 1600 CFM 80 80 AFUE 92 92 AFUE 5 2000 CFM 96 96 AFUE 97 97 AFUE MBTU h 030 30 000 BTU h 080 80 000 BTU h 040 40 000 BTU h 100 100 000 BTU h 060 60 000 BTU h 120 12...

Страница 5: ...installing the control on a furnace Return any old or new controls to their containers before touching any ungrounded object Product Application This product is designed for use as a residential home gas furnace It is not designed or certified for use in mobile home trailer or recreational vehicle applications In the U S A this furnace can be used in the following non industrial commercial applica...

Страница 6: ...ermination locations Also for 90 furnaces refer to the Vent Flue Pipe and Combustion Air Pipe Termination Locations section in this manual or the installation instructions to determine if the piping system from furnace to termination can be accomplished within the guidelines given NOTE The length of flue and or combustion air piping can be a limiting factor in the location of the furnace Locate th...

Страница 7: ...f 0 25 square inches per 1 000 BTU hr of furnace input rating One of the ventilation openings must be within 12 inches of the top the other opening must be within 12 inches of the bottom of the confined space In a typical construction the clearance between the door and door frame is usually adequate to satisfy this ventilation requirement Furnace Suspension If suspending the furnace from rafters o...

Страница 8: ...me space with other gas appliances such as a water heater ensure there is an adequate supply of combustion and ventilation air for the other appliances Refer to the latest edition of the Na tional Fuel Gas Code NFPA 54 ANSI Z223 1 Section 9 3 or CAN CGA B149 Installation Codes Sections 7 2 7 3 or 7 4 or applicable provisions of the local building codes for deter mining the combustion air requireme...

Страница 9: ...2 Combining spaces in different stories The volumes of spaces in different stories shall be considered as com municating spaces where such spaces are connected by one or more openings in doors or floors having a total minimum free area of 2 in 2 1000 Btu hr 4400 mm2 kW of total input rating of all appliances 9 3 3 Outdoor Combustion Air Outdoor combustion air shall be provided through opening s to...

Страница 10: ...ume b The outdoor size reduction factor shall be 1 minus the ratio of interior spaces c The minimum size of outdoor opening s shall be the full size of outdoor opening s calculated in accor dance with 9 3 3 multiplied by the reduction factor The minimum dimension of air openings shall not be less than 3 in 80 mm 9 3 5 Engineered Installations Engineered combustion air installations shall provide a...

Страница 11: ... furnace side panel suspending it below the fur nace A minimum clearance of 5 5 below the furnace must be provided for the drain trap Additionally the appropriate downward piping slope must be maintained from the drain trap to the drain location Refer to Condensate Drain Trap and Lines section in this manual or the installation instruc tions for further details If the drain trap and drain line wil...

Страница 12: ...as at standard altitude Propane gas installations re quire an orifice change to compensate for the energy con tent difference between natural and propane gas High altitude installations may require both a pressure switch and an orifice change These changes are neces sary to compensate for the natural reduction in the density of both the gas fuel and the combustion air at higher altitude Refer to t...

Страница 13: ... door window or gravity air inlet into any building The vent termination of a direct vent application must terminate at least 12 inches from any opening through which flue gases may enter a building door window or gravity air inlet The vent termination of vent pipe run vertically through a roof must terminate at least 12 inches above the roof line or the anticipated snow level and be at least 12 i...

Страница 14: ...engths and Diameters Refer to the preceding table for applicable length elbows and pipe diameter for construction of the vent flue and com bustion air intake pipe systems of a non direct vent single pipe installation The number of elbows tabulated rep resents the number of elbows and or tees in each Vent Flue Combustion Air Intake pipe Elbows and or tees used in the terminations must be included w...

Страница 15: ...sement installation the vent flue pipe can be run be tween joist spaces If the vent pipe must go below a joist and then up into the last joist space to penetrate the header two 45 elbows should be used to reach the header rather than two 90 elbows Direct Vent Dual Pipe Piping Direct vent installations require both a combustion air intake and a vent flue pipe The pipes may be run horizontally and e...

Страница 16: ...ired condensing furnaces The 72950 kit can be used for a 2 diameter pipe system and the 72951 can be used for a 3 diameter pipe system Both the combustion air inlet and the exhaust vent pipes must attach to the ter mination kit The termination kit must terminate outside the structure and must be installed per the instructions outlined below for vertical or horizontal termination Vertical termina t...

Страница 17: ...rizontally with the left side down there are two options for connecting the vent pipe to the furnace Option 1 Venting may be connected to the furnace vent pipe fitting on the original top now the end of the furnace Option 2 The internal vent pipe and elbow may be removed from the furnace to permit the vent to exit the top original side of the furnace If this option is used an RF000142 Vent Drain c...

Страница 18: ... possible yellow tipping In some areas the gas supplier may artificially derate the gas in an effort to compensate for the effects of altitude If the gas is artificially derated the appropriate orifice size must be determined based upon the BTU ft3 content of the derated gas and the altitude Refer to the National Fuel Gas Code NFPA 54 ANSI Z223 1 and information provided by the gas supplier to det...

Страница 19: ...maintained as shipped from the factory 7 Install a manual shutoff valve between the gas meter and unit within six feet of the unit If a union is installed the union must be downstream of the manual shutoff valve between the shutoff valve and the furnace 8 Tighten all joints securely GAS PIPING CHECKS Before placing unit in operation leak test the unit and gas connections WARNING To avoid possibili...

Страница 20: ...ollow the gas supplier s instructions If you cannot reach your gas supplier call the fire depart ment Installation and service must be performed by a qualified installer service agency or the gas supplier 3 8 1 2 5 8 3 4 7 8 1 2 3 4 10 730 1 700 3 200 5 300 8 300 3 200 7 500 20 500 1 100 220 3 700 5 800 2 200 4 200 30 400 920 2 000 2 900 4 700 1 800 4 000 40 370 850 1 700 2 700 4 100 1 600 3 700 5...

Страница 21: ...appli cable codes The furnace must be electrically grounded in accordance with local codes or in their absence with the latest edition of The National Electric Code ANSI NFPA 70 and or The Canadian Electric Code CSA C22 1 WARNING HIGH VOLTAGE To avoid personal injury or death due to electrical shock disconnect electrical power before servicing or changing any electrical wiring Humidifier 1 0 Amp m...

Страница 22: ...ine voltage wiring to the inside of the furnace the wiring must conform to all local codes and have a minimum temperature rating of 105 C All line voltage wire splices must be made inside the furnace junction box The integrated control module humidifier terminal 120V HUM H is energized with 115 volts whenever the induced draft blower is energized This terminal can also be used to provide 115 volt ...

Страница 23: ... R W ROOM THERMOSTAT INTEGRATED FURNACE CONTROL MODULE REMOTE COOLING UNIT TWO STAGE Y2 Y2 Thermostat Single Stage Heating with Two Stage Cooling WARNING HIGH VOLTAGE To avoid personal injury or death due to electrical shock disconnect electrical power before servicing or changing any electrical wiring Fossil Fuel Applications This furnace can be used in conjunction with a heat pump in a fossil fu...

Страница 24: ...ctrical power to the furnace 3 Set the room thermostat to the lowest possible setting 4 Remove the burner compartment door NOTE This furnace is equipped with an ignition device which automatically lights the burner Do not try to light the burner by hand 5 Move the furnace gas valve manual control to the OFF position 6 Wait five minutes then smell for gas Be sure check near the floor as some types ...

Страница 25: ... right switches are pressed All 9 speeds are available for circulation 3 When the center switch is pressed the current dis played speed will be selected and control will imme diately apply that speed setting THERMOSTAT CALL AVAILABLE SPEEDS G F01 F02 F03 DEFAULT F04 F05 F06 F07 F08 F09 Circulation Speed Table Cooling Mode Sequence of Operation Low Stage Cooling Mode Sequence On a call for low stag...

Страница 26: ... control will apply the newly selected speed in next cooling call THERMOSTAT CALL AVAILABLE SPEEDS Y Y1 F01 F02 F03 F04 DEFAULT F05 F06 F07 F08 F09 Single Stage Cooling Speed Table for 2 Stage IFC THERMOSTAT CALL AVAILABLE SPEEDS Y2 F01 F02 F03 F04 F05 DEFAULT F06 F07 F08 F09 Two Stage Cooling Speed Table for 2 Stage IFC Furnace Shutdown 1 Set the thermostat to the lowest setting The inte grated c...

Страница 27: ...es standpipe and field supplied drain line must be checked annually and cleaned as often as neces sary to ensure proper condensate drainage FLAME SENSOR QUALIFIED SERVICER ONLY Under some conditions the fuel or air supply can create a nearly invisible coating on the flame sensor This coating acts as an insulator causing a drop in the flame sensing signal If this occurs a qualified servicer must ca...

Страница 28: ...flow CFM is within the temperature rise range see Airflow Data in spec sheet and external static pressure range approximately 0 5 water col umn How to instructions can be found in the service man ual under Checking External Static Pressure and Checking Temperature Rise CLOCKING A GAS METER 1 Turn off all gas appliances in the home 2 Turn on the furnace Ensure the furnace is operating at a 100 firi...

Страница 29: ...212 529 60 15 30 60 120 300 35 103 206 514 GAS RATE CUBIC FEET PER HOUR Seconds for One Revolution Size of Test Dial Seconds for One Revolution Size of Test Dial Locate 40 seconds for one revolu on in the chart below Then locate the 1 cu dial column and select the corresponding CFH from the 40 seconds for one revolu on row TABLE 2 5 Use this formula to verify the Cubic Feet per Hour CFH input dete...

Страница 30: ...re adjusting the pressure regulator In no case should the final manifold pressure vary more than plus or minus 3 inches water column from 3 5 inches water column for natural gas or 10 inches water column for propane gas Since normally propane gas is not installed with a gas meter clocking will be virtually impossible The gas orifices used with propane are calculated for 2500 BTU per cubic foot gas...

Страница 31: ...477 C9S961005CNAA 0 10 05 0 25 1 49 07 1 70 0130F00477 C9S961205CNAA 0 10 05 0 25 0 85 05 1 00 0130F00476 M9S96 C9S96 Pressure Switch Trip Points And Usage Chart Model ID Blower Coil Cover Pressure Switch Assembly Part Model Coil Cover Set Point on Pressure Fall PF W C Coil Cover Max Make On Pressure Rise W C ID Blower Set Point on Pressure Fall PF W C ID Blower Max Make On Pressure Rise W C ID Bl...

Страница 32: ...MMON OR NEUTRAL LEG INCOMING POWER CHECKING FOR PHASING PRIMARY TO SECONDARY OF UNMARKED TRANSFORMERS If meter reads approximately 96 volts the primary to secondary are in phase if reads approximately 144 volts out of phase reverse low voltage wires NOTE For flame rectification the common side of the secondary voltage 24 V is cabinet grounded If you were to bench test a transformer the primary neu...

Страница 33: ... before servicing 1 Check wiring visually for signs of overheating dam aged insulation and loose connections 2 Use an ohmmeter to check continuity of any suspect ed open wires 3 If any wires must be replaced replace with AWM 105 C 2 64 thick insulation of the same gauge or its equivalent CHECKING THERMOSTAT WIRING WARNING Disconnect ALL power before servicing 1 Remove the blower compartment door t...

Страница 34: ... a main harness and a control harness The main pin harness has White neutral wire connected to the Neutral terminal on the control board Black wire con nected to the CIRC H terminal on the control board Red wire connected to the COM terminal which is a female spade connection next to the T1 T5 Green ground wire connected to cabinet ground The control harness has Blue wire connected to T1 on the co...

Страница 35: ...e is provided in the blower performance specification section Determine and adjust temperature rise as follows 1 Operate furnace with burners firing for approximately ten minutes Check BTU input to furnace do not ex ceed input rating stamped on rating plate Ensure all registers are open and all duct dampers are in their final fully or partially open position 2 Place thermometers in the return and ...

Страница 36: ...n electrical power and verify proper unit operation To aid in identifying these controls refer to the Primary Limit Charts in furnace Technical Manual for part number tem perature setting and color s code Manual Reset Auxiliary Limit Located in Blower Deck The 90 single stage upflow furnaces use two auxiliary limit switch for control of high temperatures within the fur nace or duct work This contr...

Страница 37: ...Then look for the ignitor glowing which indicates there is power to the ignition control Measure the voltage between each side of the rollout control and ground while the ignition control tries to power the gas valve 2 Measure the voltage between each side of the rollout control and ground during the ignition attempt Refer to the following figure RED RESET BUTTON COLOR IDENTIFYING Checking Flame R...

Страница 38: ...o burner design orifice sizing gas pressure primary and secondary air vent and proper seating of burners Burners have been redesigned for 34 5 chassis furnaces Overall length and width dimensions remain the same as 40 model burners The burners used 34 5 models have burner head insert with larger diameter center hole and a larger number of surrounding holes 025 002 CARRYOVER SLOT WIDTH 16X 125 x 03...

Страница 39: ...nd all other gas consuming appli ances on the same gas supply line 4 Measure furnace gas supply pressure with burners firing Supply pressure must be within the range spec ified in the following table Natural Gas Minimum 4 5 w c Maximum 10 0 w c Propane Gas Minimum 11 0 w c Maximum 13 0 w c INLET GAS SUPPLY PRESSURE If supply pressure differs from above make necessary ad justments to pressure regul...

Страница 40: ...e to decrease pressure Replace regulator cover screw g Turn off all electrical power and gas supply to the system h Remove the manometer hose from the hose barb fitting or outlet pressure boss i Turn outlet pressure test screw in to seal pressure port clockwise 7 in lb minimum 6 Honeywell VR8215 Valve a Remove the outlet pressure boss plug Install an 1 8 NPT hose barb fitting into the outlet press...

Страница 41: ...ccurring with inadequate venting caused by a restricted or blocked vent pipe WARNING HIGH VOLTAGE Disconnect ALL power before servicing or in stalling this unit Multiple power sources may be present Failure to do so may cause proper ty damage personal injury or death 1 Remove burner compartment door to gain access to pressure switch es 2 Remove wires from the pressure switch es electrical terminal...

Страница 42: ...g the ignition control will result in the same failure code originally displayed WARNING Line Voltage now present These tests must be completed within a given time frame due to the operation of the ignition control 1 Check for 120 volts from Line 1 Hot to Line 2 Neu tral at the ignition control No voltage check the door switch connections and wire harness for continuity 2 Check for 24 volts from W...

Страница 43: ...iter ANNUAL INSPECTION The furnace should be inspected by a qualified installer or service agency at least once per year This check should be performed at the beginning of the heating season This will ensure that all furnace components are in proper working or der and that the heating system functions appropriately Pay particular attention to the following items Repair or service as necessary Flue...

Страница 44: ...ents can be made in 7 Secs increments from0 to 35 Secs Cool Off Delay Delay Seconds Default set at 65 Secs Adjustments can be made in 5 Secs increments from 0 to 120 Secs Blower Speed for Gas Heat Mode xx xx Blower Speed Number F01 F02 Gas Heat On Delay Delay Seconds Default set at 30 Secs Adjustments can be made in 5 Secs increments from 5 to 30 Secs Gas heat Off Delay Delay Seconds Default set a...

Страница 45: ...45 1 STAGE STATUS CODES STATUS MENU Idle Continous Fan Compressor Cooling Low Stage Compressor Cooling High Stage Gas heat Single Stage Control OEM test Mode Mode Main Menu ...

Страница 46: ...tor blower motor Correct speed or replace blower motor if necessary Loose or improperly connected wiring in high limit circuit Tighten or correct wiring connection Flame sensed with no call for heat Correct short at flame sensor or in flame sensor wiring Short to ground in flame sense circuit Lingering burner flame Slow closing gas valve Open fuse Replace fuse Short in low voltage wiring Locate an...

Страница 47: ...control module Blown fuse or tripped circuit breaker Correct condition which caused fuse to open replace fuse Integrated control module is non functional Replace non functional integrated control module Furnace fails to operate Grounding fault Poor neutral connection Verifyneutral wire connection to furnace continuityto ground source Furnace fails to operate Open roll out switch Check for correct ...

Страница 48: ...69 1206 1133 1063 999 934 861 F06 1796 1744 1691 1638 1584 1532 1473 1422 F07 1874 1823 1775 1729 1675 1621 1567 1512 F08 1798 1754 1719 1672 1627 1585 1546 1497 F09 1991 1947 1900 1854 1808 1759 1707 1655 F01 1176 1107 1037 969 891 825 753 692 F02 1773 1721 1671 1621 1571 1521 1470 1421 F03 1709 1658 1607 1556 1503 1451 1399 1349 F04 1651 1597 1542 1491 1437 1384 1332 1278 F05 1467 1409 1352 1307...

Страница 49: ...8 1269 1206 1133 1063 999 934 861 F06 1796 1744 1691 1638 1584 1532 1473 1422 F07 1874 1823 1775 1729 1675 1621 1567 1512 F08 1798 1754 1719 1672 1627 1585 1546 1497 F09 1991 1947 1900 1854 1808 1759 1707 1655 F01 1176 1107 1037 969 891 825 753 692 F02 1773 1721 1671 1621 1571 1521 1470 1421 F03 1709 1658 1607 1556 1503 1451 1399 1349 F04 1651 1597 1542 1491 1437 1384 1332 1278 F05 1467 1409 1352 ...

Страница 50: ...38 1269 1206 1133 1063 999 934 861 F06 1796 1744 1691 1638 1584 1532 1473 1422 F07 1874 1823 1775 1729 1675 1621 1567 1512 F08 1798 1754 1719 1672 1627 1585 1546 1497 F09 1991 1947 1900 1854 1808 1759 1707 1655 F01 1176 1107 1037 969 891 825 753 692 F02 1773 1721 1671 1621 1571 1521 1470 1421 F03 1709 1658 1607 1556 1503 1451 1399 1349 F04 1651 1597 1542 1491 1437 1384 1332 1278 F05 1467 1409 1352...

Страница 51: ...8 1415 50 1357 1299 1246 F04 1600 44 1555 46 1505 47 1460 49 1412 50 1364 1309 1260 F01 1176 N A 1107 N A 1037 N A 969 N A 891 N A 825 753 692 F02 1773 50 1721 52 1671 53 1621 55 1571 57 1521 1470 1421 F03 1709 52 1658 54 1607 55 1556 57 1503 59 1451 1399 1349 F04 1651 54 1597 56 1542 58 1491 60 1437 62 1384 1332 1278 F01 1187 N A 1101 N A 1013 N A 931 N A 847 N A 764 677 604 F02 1973 54 1916 56 1...

Страница 52: ... 1008 F05 874 828 791 750 703 655 602 547 F06 950 908 865 826 786 739 689 638 F07 1097 1056 1019 988 952 921 880 842 F08 1166 1127 1092 1060 1027 994 960 926 F09 1407 1373 1338 1308 1282 1253 1229 1203 F01 804 740 670 586 501 407 347 N A F02 1422 1375 1332 1288 1245 1200 1154 1108 F03 1502 1455 1410 1365 1322 1278 1237 1195 F04 1567 1519 1476 1441 1402 1360 1319 1278 F05 1347 1299 1253 1205 1157 1...

Страница 53: ...1653 1596 1538 1480 1422 1362 1306 1247 F05 1496 1437 1376 1315 1250 1189 1126 1056 F06 1640 1587 1527 1471 1414 1357 1294 1235 F07 1955 1937 1909 1860 1813 1765 1712 1662 F08 2086 2039 1991 1944 1896 1855 1810 1763 F09 2222 2178 2133 2088 2043 1998 1954 1910 F01 1056 962 866 772 666 574 501 429 F02 2096 2050 2005 1948 1899 1848 1800 1755 F03 2023 1973 1927 1877 1829 1781 1731 1680 F04 1946 1900 1...

Страница 54: ...7 1070 1039 1008 F05 874 828 791 750 703 655 602 547 F06 950 908 865 826 786 739 689 638 F07 1097 1056 1019 988 952 921 880 842 F08 1166 1127 1092 1060 1027 994 960 926 F09 1407 1373 1338 1308 1282 1253 1229 1203 F01 804 740 670 586 501 407 347 N A F02 1422 1375 1332 1288 1245 1200 1154 1108 F03 1502 1455 1410 1365 1322 1278 1237 1195 F04 1567 1519 1476 1441 1402 1360 1319 1278 F05 1347 1299 1253 ...

Страница 55: ...4 1653 1596 1538 1480 1422 1362 1306 1247 F05 1496 1437 1376 1315 1250 1189 1126 1056 F06 1640 1587 1527 1471 1414 1357 1294 1235 F07 1955 1937 1909 1860 1813 1765 1712 1662 F08 2086 2039 1991 1944 1896 1855 1810 1763 F09 2222 2178 2133 2088 2043 1998 1954 1910 F01 1056 962 866 772 666 574 501 429 F02 2096 2050 2005 1948 1899 1848 1800 1755 F03 2023 1973 1927 1877 1829 1781 1731 1680 F04 1946 1900...

Страница 56: ... F05 874 828 791 750 703 655 602 547 F06 950 908 865 826 786 739 689 638 F07 1097 1056 1019 988 952 921 880 842 F08 1166 1127 1092 1060 1027 994 960 926 F09 1407 1373 1338 1308 1282 1253 1229 1203 F01 804 740 670 586 501 407 347 N A F02 1422 1375 1332 1288 1245 1200 1154 1108 F03 1502 1455 1410 1365 1322 1278 1237 1195 F04 1567 1519 1476 1441 1402 1360 1319 1278 F05 1347 1299 1253 1205 1157 1111 1...

Страница 57: ...1 1520 1465 F04 1653 1596 1538 1480 1422 1362 1306 1247 F05 1496 1437 1376 1315 1250 1189 1126 1056 F06 1640 1587 1527 1471 1414 1357 1294 1235 F07 1955 1937 1909 1860 1813 1765 1712 1662 F08 2086 2039 1991 1944 1896 1855 1810 1763 F09 2222 2178 2133 2088 2043 1998 1954 1910 F01 1056 962 866 772 666 574 501 429 F02 2096 2050 2005 1948 1899 1848 1800 1755 F03 2023 1973 1927 1877 1829 1781 1731 1680...

Страница 58: ...395 331 122 F02 1823 37 1776 38 1720 40 1679 41 1642 41 1597 1553 1504 F03 1778 38 1729 39 1690 40 1648 41 1605 42 1558 1497 1449 F04 1722 40 1660 41 1609 42 1553 44 1507 45 1455 1402 1350 F01 809 N A 740 N A 669 N A 603 N A 536 N A 449 377 319 F02 1754 49 1707 50 1673 51 1640 52 1604 53 1568 1538 1509 F03 1648 52 1620 53 1586 54 1552 55 1515 56 1480 1449 1412 F04 1558 55 1517 56 1479 58 1441 59 1...

Страница 59: ...1118 1078 F09 1427 1390 1362 1327 1297 1260 1224 1193 F01 715 658 589 524 465 412 360 279 F02 1415 1385 1355 1322 1291 1255 1219 1186 F03 1388 1360 1325 1291 1259 1223 1191 1157 F04 1290 1252 1215 1182 1143 1107 1071 1032 F05 916 867 817 767 710 657 608 563 F06 985 940 892 842 797 746 693 649 F07 1118 1078 1037 992 952 910 863 822 F08 1191 1153 1114 1074 1034 993 951 911 F09 1471 1440 1409 1377 13...

Страница 60: ...9 1574 1526 1479 F05 1475 1421 1369 1314 1260 1207 1152 1097 F06 1626 1578 1522 1475 1427 1353 1328 1283 F07 1693 1639 1588 1542 1491 1437 1390 1340 F08 1775 1723 1674 1629 1580 1529 1484 1435 F09 2161 2122 2084 2048 2010 1973 1940 1914 F01 1118 1035 952 860 750 663 590 519 F02 2143 2095 2047 2002 1954 1891 1850 1802 F03 2025 1977 1930 1897 1848 1798 1750 1703 F04 1906 1877 1828 1778 1726 1674 162...

Страница 61: ...1390 1362 1327 1297 1260 1224 1193 F01 715 658 589 524 465 412 360 279 F02 1415 1385 1355 1322 1291 1255 1219 1186 F03 1388 1360 1325 1291 1259 1223 1191 1157 F04 1290 1252 1215 1182 1143 1107 1071 1032 F05 916 867 817 767 710 657 608 563 F06 985 940 892 842 797 746 693 649 F07 1118 1078 1037 992 952 910 863 822 F08 1191 1153 1114 1074 1034 993 951 911 F09 1471 1440 1409 1377 1347 1314 1283 1247 F...

Страница 62: ...619 1574 1526 1479 F05 1475 1421 1369 1314 1260 1207 1152 1097 F06 1626 1578 1522 1475 1427 1353 1328 1283 F07 1693 1639 1588 1542 1491 1437 1390 1340 F08 1775 1723 1674 1629 1580 1529 1484 1435 F09 2161 2122 2084 2048 2010 1973 1940 1914 F01 1118 1035 952 860 750 663 590 519 F02 2143 2095 2047 2002 1954 1891 1850 1802 F03 2025 1977 1930 1897 1848 1798 1750 1703 F04 1906 1877 1828 1778 1726 1674 1...

Страница 63: ...1427 1390 1362 1327 1297 1260 1224 1193 F01 715 658 589 524 465 412 360 279 F02 1415 1385 1355 1322 1291 1255 1219 1186 F03 1388 1360 1325 1291 1259 1223 1191 1157 F04 1290 1252 1215 1182 1143 1107 1071 1032 F05 916 867 817 767 710 657 608 563 F06 985 940 892 842 797 746 693 649 F07 1118 1078 1037 992 952 910 863 822 F08 1191 1153 1114 1074 1034 993 951 911 F09 1471 1440 1409 1377 1347 1314 1283 1...

Страница 64: ... 1656 1610 F04 1804 1755 1710 1664 1619 1574 1526 1479 F05 1475 1421 1369 1314 1260 1207 1152 1097 F06 1626 1578 1522 1475 1427 1353 1328 1283 F07 1693 1639 1588 1542 1491 1437 1390 1340 F08 1775 1723 1674 1629 1580 1529 1484 1435 F09 2161 2122 2084 2048 2010 1973 1940 1914 F01 1118 1035 952 860 750 663 590 519 F02 2143 2095 2047 2002 1954 1891 1850 1802 F03 2025 1977 1930 1897 1848 1798 1750 1703...

Страница 65: ...271 F04 1537 46 1490 48 1447 49 1403 51 1354 53 1301 1247 1190 F01 1029 N A 959 N A 890 N A 811 N A 727 N A 647 579 511 F02 1814 39 1766 40 1722 41 1679 42 1637 43 1595 1555 1511 F03 1893 38 1844 39 1803 39 1763 40 1723 41 1685 1641 1604 F04 1738 41 1680 42 1637 43 1596 45 1554 46 1510 1469 1420 F01 1008 N A 934 N A 855 N A 779 N A 702 N A 628 557 493 F02 2026 44 1981 45 1929 46 1901 47 1858 48 18...

Страница 66: ... MANUFACTURER S SPECIFIED REPLACEMENT PARTS MUST BE USED WHEN SERVICING 3 IF ANY OF THE ORIGINAL WIRE AS SUPPLIED WITH THE FURNACE MUST BE REPLACED IT MUST BE REPLACED WITH WIRING MATERIAL HAVING A TEMPERATURE RATING OF AT LEAST 105 C USE COPPER CONDUCTORS ONLY 4 UNIT MUST BE PERMANENTLY GROUNDED AND CONFORM TO N E C AND LOCAL CODES 5 TO RECALL THE LAST 6 FAULTS MOST RECENT TO LEAST RECENT DEPRESS...

Страница 67: ...t contact us Amana Brand Products http www amana hac com about us contact us You can also scan the QR code on the right for the product brand you purchased to be directed to the feedback page GOODMAN BRAND AMANA BRAND is a registered trademark of Maytag Corporation or its related companies and is used under license All rights reserved Copyright 2021 Goodman Manufacturing Company L P ...

Отзывы: