3
INSTALLATION REQUIREMENTS
Tools and Parts
Gather the required tools and parts before starting
installation. Read and follow the instructions provided
with any tools listed here.
Tools needed:
Flat-blade screwdriver
#2 Phillips screwdriver
Wire stripper
(direct wire installations)
Tin snips
(new vent installations)
Adjustable wrench that
opens to 1" (25 mm) or
hex-head socket wrench
Vent clamps
1/4" (6 mm) nut driver
(recommended)
Utility knife
Tape measure
Pliers
Level
Caulking gun and
compound (for installing
new exhaust vent)
Putty knife
Parts supplied:
Leveling legs (4)
Parts package is located in dryer drum. Check that all parts
are included.
Содержание MEDP575G
Страница 2: ...2 DRYER SAFETY ...
Страница 20: ...NOTES W11045669A W11045670A SP 05 17 TM 2017 Maytag All rights reserved ...