Functioning of the placement hinge 

 
The placement hinge will not function if the total height is not correctly 
dimensioned. 
If item AZ256 / AZ257 / AZ258 / AZ259 has, by mistake, been ordered and 

installed with the wrong height measurements, do at least make sure that the 
bottom component is not set too far down in the ground. If there is a difference 

of more than 50 mm between the top of the lower anchor tube and the floor 
surface, the placement hinge cannot be tilted and the parasol cannot be erected. 

Moreover, the electrician will not be able to run the power cables. 

 

Be sure to measure and specify the correct total height for installation. 

 

 
 

 

 

 

 
 

 

Caution 

wrong height 

measurement: too 

short for installation 

 

height 

measurement 

necessary for 

correct  

installation 

 

 

 

lower edge of 

steel anchor 

plate 

 

Содержание PARASOLS AZ256

Страница 1: ...f this base pedestal To avoid any misunderstanding we advise you to read these instructions carefully and then keep them for later reference Non observation of mounting instructions can result in pers...

Страница 2: ...Stand 40 0414 English page 2 of 13 wooden planking reinforced concrete base...

Страница 3: ...onent is not set too far down in the ground If there is a difference of more than 50 mm between the top of the lower anchor tube and the floor surface the placement hinge cannot be tilted and the para...

Страница 4: ...n of the main axis of the parasol Allow enough clearance between parasols or from walls Parasols that are located too close together wear sooner Parasols may sway slightly If there is not enough space...

Страница 5: ...5 of 13 4 For AZ257 AZ258 and AZ259 now add the additional steel plates Use the enclosed hexagonal screws M5 x 60 mm as spacers and for assembly between the individual steel plates to ensure prescise...

Страница 6: ...and AZ259 now use the 4 hex socket head screws to connect the additional layers of steel plates with each other one at each corner 2 layers of steel plates M16 x 30 mm 3 layers of steel plates M16 x 4...

Страница 7: ...ightened firmly enough there will not be sufficient tensile force to trigger self locking If the screws are tightened too firmly and over stressed the screw connection may slacken Tighten the M16 cyli...

Страница 8: ...so put the M16x30mm countersunk screw and tighten it using the 10 mm hex key and extension provided 8 Slip the 12 mm washer on the M12x30mm countersunk screw and tighten it using the 8 mm hex key pro...

Страница 9: ...below the terrace surface cf illustration The difference of 4 mm corresponds to the thickness of the checker plate Be sure to order bottom component with the correct height measurements so that it wi...

Страница 10: ...f the upper anchor tube of AZ256 AZ257 AZ258 AZ259 is not in an absolutely vertical position the parasol will stand slanted This would have a negative impact on the overall optical appearance in parti...

Страница 11: ...wire by a qualified electrician Electric installation work should be carried out solely by a certified electrician Disregarding this warning may result in serious personal injuries Personal injury in...

Страница 12: ...ground cable from the cable in the parasol pole Lift the parasol out of the anchor foot 2 Remove the upper anchor tube completely by screwing it off 3 Screw the top plate onto the lower anchor tube cf...

Страница 13: ...nvolved should discuss this installation option on site If these instructions are provided to everyone during the planning period arguments can be harmonised and therefore unnecessary costs for incorr...

Страница 14: ...Z256 Art no AZ256 Multi piece screw off upper part and base spacer for centre pole 100 mm mounted on site heaviest part approx 63 kg base plate size 147x147 cm steel plate thickness x 15 mm hot dip ga...

Страница 15: ...______mm min 100 mm max 600 mm winter top plate Cable gland for tension relief Only necessary if power supply is planned required ______ not required ______ mandatory When ordering please fill in the...

Страница 16: ...Z257 Art no AZ257 Multi piece screw off upper part and base spacer for centre pole 100 mm mounted on site heaviest part approx 63 kg base plate size 147x147 cm steel plate thickness x 15mm hot dip gal...

Страница 17: ...r supply is planned required ______ not required ______ mandatory When ordering please fill in the fields below Quantity mandatory Dealer Name and address optional Dealer Commission optional Dealer Or...

Страница 18: ...Z258 Art no AZ258 Multi piece screw off upper part and base spacer for centre pole 100 mm mounted on site heaviest part approx 63 kg base plate size 147x147 cm steel plate thickness x 15mm hot dip gal...

Страница 19: ...r supply is planned required ______ not required ______ mandatory When ordering please fill in the fields below Quantity mandatory Dealer Name and address optional Dealer Commission optional Dealer Or...

Страница 20: ...259 This order sheet must be filled out completely and supplied to the MAY company before production Art no AZ259 Multi piece screw off upper part and base spacer for centre pole 100 mm mounted on sit...

Страница 21: ...supply is planned required ______ not required ______ mandatory When ordering please fill in the fields below Quantity mandatory Dealer Name and address optional Dealer Commission optional Dealer Ord...

Отзывы: