11921 Sl
auson
A
ve
. Sa
nt
a Fe
Spri
ngs, C
A. 90670 (800) 22
7-41
16 F
AX
(88
8)
771-7713
25
3
. Attach chain and hoist on each side of
platform at positions shown in
FIG. 25-2
.
(Place chain all around platform.) Hoist
the Liftgate, and then place floor jack
under main frame
(FIG. 25-2)
. Jack the
Liftgate into position. Make sure vehicle
floor is horizontal and pins are lined up
as shown in
FIG. 25-2
.
FIG. 25-2
HOIST HERE
STEP 2 - WELD LIFTGATE TO VEHICLE - Continued
VEHICLE FLOOR
(HORIZONTAL)
FLOOR JACK
MAIN
FRAME
PINS
2
. Tack weld platform stops to shackles,
on LH and RH side of platform, as
shown in
FIGS. 25-1A and 25-1B
.
NOTE:
To prevent misalignment when hoisting Liftgate by the platform, each plat-
form stop must be tack welded to shackle.
FIG. 25-1A
TACK WELDING
PLATFORM STOPS
FIG. 25-1B
PLATFORM
STOP
SHACKLE
3/16”
TACK
PLATFORM
WARNING
To prevent injury, support Liftgate to keep it from tipping over. Stay clear of
place under the platform where Liftgate could fall on you.
!
VERTICAL
To protect the original paint system if equipped, a 3” wide area of paint must
be removed from all sides of the weld area before welding.
CAUTION
Содержание 72-150
Страница 69: ......