11921 Sl
auson
A
ve
. Sa
nt
a Fe
Spri
ngs, C
A. 90670 (800) 22
7-41
16 F
AX
(88
8)
771-7713
52
3.
Bolt opener to main frame
(FIG. 52-1)
.
BOLTING PLATFORM OPENER
FIG. 52-1
PLATFORM
OPENER
LOCK NUT
1/2”-20
STEP 11 - BOLT PLATFORM OPENER TO LIFTGATE
- Continued
CAP SCREW
1/2”-20 X 3/1/2” LG
MAIN
FRAME
If there is any interference with the platform while stowing Liftgate, check for
damage on bottom of platform, flipover, and the hinge in between. A damaged
platform or flipover may result in personal injury and additional damage to
Liftgate.
CAUTION
!
4.
Stow and unstow platform several
times to verify it stows and unstows
correctly and there is no interfer-
ence
(FIGS. 52-2 and 52-3)
.
PLATFORM UNSTOWED & LOWERED
FIG. 52-3
STOWED PLATFORM
FIG. 52-2
Содержание 72-150
Страница 69: ......