LIFT CORPORATION
Sht. 9 of 13 DSG#
M-16-04
Rev.
A
Date: 01/13/17
© MAXON Lift Corp. 2017
11.
Push toggle switch to
DOWN
position
(FIG. 9-1)
to lower platform
until yellow runner
arrow is aligned with yellow tape on column
(FIG. 9-2B)
. Platform will be released from the
locking wedges on the Liftgate column. Next,
use street-side control switches
1
and
2
to
UNFOLD
platform
(FIGS. 9-2A and 9-2C)
. Hold
both toggle switches until platform reaches the
unfolded (horizontal) position and then release
the switches.
UNFOLDING PLATFORM
FIG. 9-2A
NOTE:
Use the street-side control switch to
check operation of the Liftgate.
UNFOLD
1
2
STREET-SIDE CONTROL SWITCH
(GRAVITY DOWN SHOWN)
FIG. 9-1
DOWN
STREET-SIDE CONTROL
FIG. 9-2C
FIG. 9-2B
RUNNER
ARROW
YELLOW
TAPE