Page
5
of
36
M-21-08 REV.B
Installation Supplement
7.
The backing plate can now be rotated to improve access to cord grips and wires.
8.
Run Purkey Severe Service positive and negative charge lines through top two cord grips and
install into Junction Box. Crimp 2-gauge battery lugs onto cables and heat shrink. Connect
cables as shown below and tighten cord grip outer nuts to compress and seal grommet on
cables.
•
Provide drip loop for all cables running into Junction Box.
LOOMED CABLES
PURKEY SEVERE SERVICE
POSITIVE AND NEGATIVE
CHARGE LINES
PROVIDE DRIP LOOP FOR
ALL CABLES RUNNING
INTO JUNCTION BOX.
PURKEY SEVERE SERVICE
POSITIVE CABLE
PURKEY SEVERE SERVICE
NEGATIVE CABLE