Page
18
of
36
M-21-08 REV.B
Addendum A
16.
Route 4 wall switch cables into Solar Box through the lower four-hole cord grip as shown below.
•
Cut off the excess switch harness. Cut approximately 4” off the jacketed portion of the
three-wire harness. Crimp and heat shrink #10 ring terminals to wires and connect as
shown below.
17.
When all connections in Solar Box are complete and checked, spray terminal studs with a
conformal coating.
18.
Tighten cord grip outer nut to compress and seal grommets.
19.
Record Optio3 WAYPOINT S/N #, Trailer number, Liftgate Serial # and e-mail to
WAYPOINT S/N:
Trailer #:
Liftgate Serial #:
4 WALL SWITCH CABLES
INTO SOLAR BOX
#1 BLACK WIRE TO
TERMINAL #1 (UP)
#2 BLACK WIRE TO
TERMINAL #2 (DOWN)
YELLOW/GREEN WIRE TO
TERMINAL #8 (ALL SW)
Optio3 WAYPOINT S/N