© Copyright 2018. MaxLite, Inc. All Rights Reserved.
12 York Ave, West Caldwell, NJ 07006 Tel: 800-555-5629 Fax: 973-244-7333 Email: [email protected]
MPulse Bollard:
6.)
Remove the template and replace it with the mounting bracket (refer to
Fig. 6
). Make sure that the
bracket is oriented in the desired position. The flat surfaces will align with the flanges. The curved
surfaces will align with the sides without the flanges.
7.)
Once the cement is dry, lay the fixture flat on a soft surface to prevent scratching or damaging.
Connect the driver input leads coming out of the bottom of the fixture to the power supply leads
from the conduit in the ground (refer to
Fig. 7
).
8.)
Place the shaft of the fixture onto the cement, aligning the holes of the mounting bracket with
the holes in the shaft. Secure it to the bracket with the four (4) M6 bolts (refer to
Fig. 8
).
Curved
Surface