background image

OPERATING INSTRUCTIONS

•  Lock the boom in place for the proper weight marking using the lock pin BEFORE 

APPLYING THE LOAD TO THE LIFT. Do not exceed the rates capacity and travel 

limits of the equipment.

•  Use appropriate levellers, slings or chains around the load capable of sustaining the 

load before using the hook to lift it. Make sure that the latching mechanism is 
working properly before moving the load.

•  Once the load is securely hooked in place, lift the load by turning the release valve 

clockwise until closed, and pumping the jack until the load is clear of any 
obstruction. Move very carefully, avoiding slopes, in the direction of travel. Avoid

 

sudden or swinging movements of the load. To lower the load, turn the release

 

valve on the hydraulic jack counter-clockwise very slowly.

ASSEMBLY INSTRUCTIONS 

•  Line up the holes on the back wheels (5) with the matching holes on the base (1).

•  Slide the leg extensions (9) into the open ends of the base. Install R-clips (7) and 

lock pins (8) to secure leg extensions to the base.

•  With the help of an assistant, install the upright mast (17) onto the base using bolts 

(4), washers (3) and nuts (2). install the mast braces (11) onto the base using bolts 
(4), washers (3) and nuts (2). Align holes at the upper end of the mast braces with 
the second hole from the top in the upright mast and fasten using bolt (18), washer 
(15) and nut (16). 

Once aligned, tightened the bolts securely. 

     

•  Install the hydraulic ram (14) to the support bracket on the upright mast using bolt 

(12), washer (15) and nut (16). Once secured, lean the hydraulic ram against the 

upright mast temporarily. 

•  Install the boom (26) on the top of the upright mast and secure with bolt (30), 

washer (15) and nut (16). 

•  Align and install the top of the hydraulic ram into the welded fork on the boom and 

secure with bolt (22), washer (15) and nut (16).

•  Slide boom extension (27) onto boom and secure with  lock pin with metal cable 

(25) and R-clip (7).

 

•  Line up four holes on the push bar (19) with the threaded holes at the rear of the 

upright mast. Install washers (20) to bolts (21) and thread into holes.

•  Install the hook and chain (29) at the end of the boom extension using bolt (28), 

washer (3) and nut (2).

•  Slide the handle (13) on the socket on the hydraulic ram.

•  Follow the air purge instructions if air gets trapped in the hydraulic system during 

the transportation (see BLEEDING THE HYDRAULIC SYSTEM ).

NOTE: 

An assistant is required to assemble this unit and minimize 

potential hazards and/or injury.

BLEEDING THE HYDRAULIC SYSTEM

Bleed excess air from the hydraulic system as follows:

• 

Open the release valve by turning it counter-clockwise.

• 

Remove the oil filler screw and fill the pump with hydraulic fluid.

•  Wait 5 minutes for trapped air to rise to the surface.

•  Pump the handle or pedal for several full strokes to eliminate any air in the system.

• 

Check the oil filler hole and if necessary, top off with more hydraulic oil.

• 

Restore the oil filler screw. Close the release valve by turning clockwise.

•  Test the ram several times for proper operation before putting it into use. Do not use 

the ram if it still does not appear to be working properly. Have a qualified service 

technician service or repair the hydraulic system.

ASSEMBLY INSTRUCTIONS

OPERATING INSTRUCTIONS

6

7

model no. 009-0222-4  |  contact us 1-888-670-6682

Содержание 009-0222-4

Страница 1: ......

Страница 2: ...efore using the product It contains important information for your safety as well as operating and maintenance advice Keep this instruction manual for future use Should this product be passed on to a...

Страница 3: ...l no 009 0222 4 contact us 1 888 670 6682 No Description 1 Base 1 2 Nut M14 5 3 Washer 14 5 4 Bolt M14 x 95 4 5 Back wheel dia 3 5 2 6 Middle wheel dia 2 8 2 7 R clip 5 8 Lock pin 14 x 88 4 9 Leg exte...

Страница 4: ...an the hydraulic ram against the upright mast temporarily Install the boom 26 on the top of the upright mast and secure with bolt 30 washer 15 and nut 16 Align and install the top of the hydraulic ram...

Страница 5: ...or loose missing or damaged parts If the crane is damaged in any way it should be removed from service immediately Check for unauthorized modi cation of the product Modi cations to this product and or...

Страница 6: ...Release valve not closing Dirt in hydraulic jack oil or pump valves not sealing Refer to Air Purge section Lift arm will not lower Jack feels spongy when lifting Cylinder ram binding Release valve br...

Страница 7: ......

Страница 8: ...isation Ce guide contient des consignes de s curit importantes ainsi que des consignes relatives l utilisation et l entretien du produit Conservez ce guide d utilisation pour toute consultation ult ri...

Страница 9: ...ez avec nous 1 888 670 6682 N Description 1 Cadre 1 2 crou M14 5 3 Rondelle 14 5 4 Boulon M14 x 95 4 5 Roue arri re diam tre 90 mm 2 6 Roue m diane diam tre 71 mm 2 7 Clavette en R 5 8 Goupille de blo...

Страница 10: ...26 sur le dessus du m t et xez la avec un boulon 30 une rondelle 15 et un crou 16 Alignez et installez le haut du v rin hydraulique dans l trier de la che et xez le avec un boulon 22 une rondelle 15...

Страница 11: ...cadre du v rin la che et la rallonge de che V ri ez si des pi ces sont desserr es manquantes ou endommag es Arr tez d utiliser la grue d atelier imm diatement si elle est endommag e V ri ez si la gru...

Страница 12: ...faire descendre le bras de levage Fermez la soupape de s ret et v ri ez si la pompe fonctionne bien Il peut tre n cessaire d effectuer les tapes pr c dentes plus d une fois pour s assurer que l air es...

Отзывы: