8
The gates must be properly installed and work freely in both directions prior to the installation of the dual gate operators.
See “Gate Operator Position” on page 6 for operator positions
.
Each entrapment protection device MUST be connected to corresponding gate operator.
Outside Property
Inside Property
to Secondary Operator
to Secondar
y Operator
to Primary Operator
to Primar
y Operator
Illustrations not to scale
installation
Photocell
(
OPENING
Cycle
ONLY
)
Photocell
(
OPENING
Cycle
ONLY
)
Sensing Edges
Entrapment Area
Entrapment Area
RS-485
Input
Power
Input
Power
•
REQUIRED -
Run AC input power wire to
EACH
gate operator.
•
REQUIRED -
Run RS-485 wires from
SECONDARY
operator to the
PRIMARY OPERATOR
.
•
Run UL 325 entrapment protection device conduits to
EACH
Corresponding
GATE OPERATOR
. (see below & page 13)
•
Run the
CLOSING
cycle protection device conduit (photocells) to the
PRIMARY OPERATOR
. (page 13)
•
Run in-ground loop wires to the
PRIMARY OPERATOR
. (page 14)
dual Gate Operators
Primary
Primary
Secondary
Secondary
“Optional” Input Power Note:
24VDC low voltage power wires can be run from a remote
power supply (MAX Magic Boxes) to power the gate
operators if desired. See page 10 for more information.
Support Bars:
See bottom of page 8.
Arms MUST be installed level.
Conduit Guidelines and Suggestions
Illustration not to scale
Check local building codes in your area for
depth of concrete before installation.
Secure EACH gate
operator to concrete
pad with four (4)
1/2” x 3” (min)
sleeve anchors.
Concrete Depth Note:
The heavier the gates, the deeper the concrete
pads should be. At least
two feet
recommended for heavier gates.
1/2
6” Above
Ground
Содержание MAX MEGATRON 2500
Страница 2: ......
Страница 13: ...11 MAX Solar Panel Approx 45 solar installation Refer to Solar application guide ...