22
INSTALLATION INSTRUCTIONS
When the declivity of the drain pipe downwards
is o ver 1/100, there should not be any winding.
The total length of the drain p ipe when pulled
out traversely shall not excee d 20m, when the
pipe is over long, a prop stand must be installed
to prevent winding.
Refer to the figures on the right for the
installation of the pipes.
1.5m~2m
Insulating
material
Downward declivity
lower than 1/100
Bend
S shape
VP30
Downward declivity
lower than 1/100
Put as deep as possible
(about 10cm)
Fig.43-9
Fig. 43-10
Drainag e test
Che ck wh ether the dr ain pi pe is
unh indered.
New built house shou ld have this test
don e befo re paving th e cei ling.
5.6 Wiring(Console)
CAUTION
The appliance shall be installed in accordance
with national wiring regualtions.
The air conditioner should use separate power
supply with rated voltage.
The external power supply to the air conditioner
should have ground wiring, which is linked to the
ground wiring of the indoor an d outdoor unit.
The wiring work should be done by qualified
persons according to circuit drawing.
An all-pole disconnection device which has at
least 3mm separation distance in all pole and
a residual current device(RCD)with the rating
of above 10mA shall be incorporated in the fixed
wiring according to the national rule.
Be sure to locate the power wiring and the
signal wring well to avoid cross-disturbance.
Do not turn on the power until you have
checked carefully after wiring.
5.6.1 Connect th e cable
The ins tallation bea rer of sensi ng
de vice rotate d to an other side, and th en
ta kes off cove r of el ectrical box. (Tak e
off the electrical bo x if the capa city is
18 000btu/h a s well as usi ng ne twork
fu nction .) (Refer to Fig.43-10)
Installation bearer
of sensing device
A ll the pictur es in this manual are fo r
e xplan ation purpose onl y. The y may be
slightl y different fr om the air conditioner
you pu rchas ed(depend on mo del). T he
a ctual shape shall preva il.
NOTE: