17. Send batch file “STOPDTMF”.
18. Disconnect the tel line from the base under test to the line
simulator.nm
19. Connect the “Bell” Oscillator to the tel line.
20. Set the “Bell” Oscillator voltage to 32V RMS 23Hz.
21. Send batch file “RINGDET”.
22. Check that the ringing voltage has been detected (1 = detected).
14.7. CHARGE CURRENT TEST
1. Connect the 11V supply to J2 pin 6 (+) and J2 pin 5 (-).
2. Connect the ammeter with a series load resistor of 56 /2 W to J3
(+) and J4 (-).
3. Switch on the 11V supply.
4. Check the Charge Voltage to J3 and J4 9.5 ± 0.5 V.
5. Switch off the 11V supply.
6. Connect the 11V supply to the “11V Supply” sockets on the test
jig.
15. CHECK PROCEDURE (HANDSET)
15.1. TEST EQUIPMENT REQUIRED AND EQUIPMENT SETUP
32
Содержание KX-TCD952NLB
Страница 2: ...1 LOCATION OF CONTROLS 2...
Страница 3: ...2 DISASSEMBLY INSTRUCUTIONS 3...
Страница 9: ...4 4 SELECTING THE HANDSET RINGER VOLUME 4 5 SELECTING THE BASE UNIT RINGER VOLUME 9...
Страница 11: ...6 BLOCK DIAGRAM RF UNIT BASE UNIT 11...
Страница 12: ...7 BLOCK DIAGRAM BASEBAND SECTION AND LINE INTERFACE BASE UNIT 12...
Страница 20: ...9 BLOCK DIAGRAM RF UNIT HANDSET 20...
Страница 21: ...10 BLOCK DIAGRAM BASE BAND SECTION HANDSET 21...
Страница 36: ...36...
Страница 37: ...16 2 HANDSET LINK 37...
Страница 38: ...38...
Страница 39: ...39...
Страница 40: ...16 3 HANDSET DOES NOT LINK 16 4 BASE UNIT DOES NOT CHARGE 40...
Страница 41: ...16 5 HANDSET DOES NOT CHARGE 41...
Страница 42: ...16 6 NO VOICE RECEPTION 42...
Страница 43: ...16 7 NO VOICE TRANSMISSION 16 8 BASE UNIT DOES NOT LINK 43...
Страница 44: ...17 CABINET AND ELECTRICAL PARTS LOCATION BASE UNIT 44...
Страница 45: ...18 CABINET AND ELECTRICAL PARTS LOCATION HANDSET 45...
Страница 46: ...19 ACCESSORIES AND PACKING MATERIALS 46...
Страница 58: ...22 1 SCHEMATIC DIAGRAM HANDSET U Q KXTCD952NLB UK Printed in Japan 58...