38
9.3 HEART RATE GRIPS REPLACEMENT
CHAPTER 9: PART REPLACEMENT GUIDE
1) Remove the 3 screws holding the 2 halves of the HR grip together (Figure A).
2) Split the HR grip in half (Figure B).
3) Disconnect the level key and HR plate wiring (Figure C) and remove the HR grip.
4) Reverse Steps 1-3 to install a new HR grip.
NOTE:
When plugging in the HR plate wiring, the red wire should go to the top plate, the white
wire to the bottom HR plate (Figure D).
5) Test the Bike for function as outlined in Section 9.21.
FIGURE A
FIGURE B
FIGURE C
FIGURE D
Содержание U7XE-03
Страница 1: ...U 7 X E 0 3 B I K E S E R V I C E M A N U A L...
Страница 26: ...23 8 1 ELECTRICAL DIAGRAMS CHAPTER 8 TROUBLESHOOTING...
Страница 65: ...62 10 3 ASSEMBLY INSTRUCTIONS CONTINUED STEP 3 STEP 4 CHAPTER 10 BIKE SPECIFICATIONS AND ASSEMBLY GUIDE...
Страница 66: ...63 10 3 ASSEMBLY INSTRUCTIONS CONTINUED STEP 5 CHAPTER 10 BIKE SPECIFICATIONS AND ASSEMBLY GUIDE...
Страница 67: ...64 FINAL ASSEMBLY 10 3 ASSEMBLY INSTRUCTIONS CONTINUED CHAPTER 10 BIKE SPECIFICATIONS AND ASSEMBLY GUIDE...
Страница 74: ...71 NOTES...