45
9.14 DRiVe BelT RePlACeMeNT
1) Remove the right side shroud as outlined in Section 9.11.
2) Pull up on the tension assembly and walk the belt off of the pulley (Figure A).
3) Remove the belt (Figure B).
4) Reverse Steps 1-3 to install a new drive belt.
NOTE:
Be sure to reattach the tension spring (Figure C). If more tension is needed on the
drive belt, multiple holes are available for the lower spring attachment (Figure D).
5) Test the bike for function as outlined in Section 9.21.
figURe A
figURe B
figURe C
figURe D
CHAPTeR 9: PART RePlACeMeNT gUiDe
Содержание U5X-04 BIKE
Страница 1: ...U 5 x 0 4 B i k e S E R V I C E M A N U A l...
Страница 5: ...2 1 1 Serial Number Location chapter 1 Serial Number Location SN PLACEMENT...
Страница 17: ...14 8 1 Electrical Diagram chapter 8 Troubleshooting HURES5x C Electrical block diagram...
Страница 18: ...15 8 1 Electrical Diagram CONTINUED Chapter 8 Troubleshooting U5x F Electrical block diagram...
Страница 19: ...16 8 1 electrical diagramS CONTINUED Pulse Sensor Wire Chapter 8 Troubleshooting POWER RESISTANCE WIRE...
Страница 23: ...20 Chapter 8 Troubleshooting 8 4 LCB wiring connectionS...
Страница 60: ...57 10 3 Assembly Instructions Continued step 3 step 4 chapter 10 Bike specification and assembly guide...
Страница 61: ...58 10 3 ASSEMBLY INSTRUCTIONS CONTINUED Step 5 Chapter 10 Bike Specifications and assembly guide...
Страница 62: ...59 final assembly 10 3 assembly instructions continued chapter 10 Bike specification and assembly guide...
Страница 71: ...68 NOTES...