52
9.7 SIDE RAIL REPLACEMENT
1) Remove the 4 screws holding on the end cap on the same side as the broken side rail using a Phillips screwdriver and remove the end cap
(Figure A).
2) Loosen the four screws under the frame of the side rail using a 5 mm Allen wrench (Figure B).
3) Slide the rail off the back of the treadmill (Figures C & D).
4) Reverse Steps 1-3 to install a new side rail.
NOTE:
After reinstalling the side rail, make sure the end cap is on first before tightening the
screws for proper gap spacing. Also be careful not to over tighten the screws, or they will poke through the top of the side rail.
FIGURE A
FIGURE B
FIGURE D
FIGURE C
CHAPTER 9: PART REPLACEMENT GUIDE
Содержание T7XE-03
Страница 1: ...T 7 X E 0 3 T R E A D M I L L S E R V I C E M A N U A L...
Страница 4: ...1 1 1 SERIAL NUMBER LOCATION CHAPTER 1 SERIAL NUMBER LOCATION...
Страница 29: ...26 8 1 ELECTRICAL DIAGRAMS CHAPTER 8 TROUBLESHOOTING...
Страница 30: ...27 8 1 ELECTRICAL DIAGRAMS P29 DIGITAL COMMUNICATION WIRE CHAPTER 8 TROUBLESHOOTING...
Страница 31: ...28 8 1 ELECTRICAL DIAGRAMS N95 UCB LITTLE BOARD WIRE CHAPTER 8 TROUBLESHOOTING...
Страница 32: ...29 N97 HAND PULSE WIRE CHAPTER 8 TROUBLESHOOTING 8 1 ELECTRICAL DIAGRAMS...
Страница 84: ...81 NOTES...