
headline bars
continuation tabs
notes
warnings
headline bars
continuation tabs
notes
warnings
model no. 062-3420-4 | contact us 1-800-689-9928
14
OPERA
TING INSTRUCTIONS
6. Measure the 1 1/2” (3.8 cm) PVC pipe (Part No. 2) against the drain and the pump and trim
the pipe to fit.
7. Do a trial assembly (dry—no glue) of the pump onto the drain pipe. Swing the pump until it
accurately faces the discharge piping, and then mark the pump and the inlet pipe/adaptor
assembly so that you can accurately install the pump in Step 8. Arrange a temporary support
under the pump to relieve the strain on the sink drain piping while the glue is setting. Leave it
in place while you measure and cut the discharge piping (Step 12).
8. Slide the pump up into position and glue the pipe (Part No. 2) into the male adaptor (Part No. 3
on the pump).
• No glue on the pump or in the motor;
• Make sure the pump is facing the right direction (match the marks from Step 7);
• Put the support in place under the motor.
9. Wrap the 1 1/4” (3.2 cm) galvanized nipple (Part No. 4) with 1 1/2 to 2 turns of PTFE pipe
thread sealant tape on each end and thread it into the pump discharge port.
10. Hold the nipple (Part No. 4) with a pipe wrench and thread one half of the 1 1/4” (3.2 cm)
union (Part No. 5) onto it, hand tight plus 1 1/2 turns with a pipe wrench or slip-joint pliers.
11. At this time, wrap the threads on both the 1 1/4” (3.2 cm) male adaptors (Part No. 6) with 1
1/2 to 2 turns of PTFE pipe thread sealant tape. Thread one of the adaptors into the other half
of the 1 1/4” (3.2 cm) union (Part No. 5), hand tight plus 1/2 turn with a wrench or a pair of
slip-joint pliers. DO NOT overtighten!
12. Install the discharge piping as shown in Figures 1 and 2. The order is:
a. 1 1/4” (3.2 cm) PVC Pipe cut to fit (Part No. 7)
b. 90° Socket to Socket Elbow (Part No. 8)
c. 1 1/4” (3.2 cm) PVC Pipe cut to fit (Part No. 7)
d. Male adaptor (Part No. 6)
e. Flow Control/Ball Valve (C), Check Valve (B)
f. 1 1/4” (3.2 cm) Discharge Pipe (Part No. 9)
13. Connect the discharge piping to the building drain.
NOTE:
• Tighten this only enough to prevent leaking. Over-tightening can crack the plastic.
• Install the check valve in the vertical discharge pipe with the threads down. Be sure the
flow arrow points AWAY from the pump. That is, when the check valve is correctly installed,
the arrow showing direction of flow should point UP.
Figure 2: Pump Installed
(Refer to Figure 1 for parts
names)
† For easier removal for
servicing or cleaning, install a
1 1/2” (3.8 cm) solvent union
in the drop pipe.
5" (12.7 cm)
Minimum
Check valve
must be installed
below the sink
bottom.
Total discharge height
should be less than 11' (3.35 m)
Содержание 062-3420-4
Страница 2: ...headline bars continuation tabs notes warnings headline bars continuation tabs notes warnings ...
Страница 19: ...WARRANTY ...
Страница 20: ......