Henan Master Machinery Co., Ltd
Tel:(+86)17737606271
www.mastermachinerys.com
11
from the slab when the floating operation is complete.
OPERATION (Finishing)
When starting the finishing operation, never set the trowels up over 1/4" pitch.
After the floating operation, the first thing to do is to remove the floating disc
from the blades. Clean the blades, spider plate and disc from cement paste
collected during the floating operation. Increase the blade pitch up to a maximum
of 1 cm for the first finishing operation and then continue to increase the pitch on
the following finishing operations. Continue the finishing passes until you obtain
the desired floor finish. The time required between each finishing pass is again
dependent on the weather conditions and water content of the concrete etc. If some
areas of the concrete set/harden too fast you may apply a small amount of water
using a hand brush as an aid to achieving the finish.
STARTING PROCEDURE:
☆
WARM CLIMATE
Open fuel valve on gas tank. Set throttle lever to "Fast" idle position, set choke
to closed position, start engine. Open choke slightly to prevent flooding. Move to
"Open" or "Run" position when engine is warm, increase throttle to maximum
operation position (3600 rpm).
STARTING PROCEDURE:
☆
COLD CLIMATE
Follow same procedure as above but allow longer warm-up period -3 to 5 minutes.
In cold weather, oil is much heavier to move and requires more time to work its
way into the moving parts. If maximum power is not attained, allow further
warm-up time.
STOPPING PROCEDURE
1.
Throttle engine down.
2.
Turn off stop switch.
Содержание FWT24
Страница 19: ...Henan Master Machinery Co Ltd Tel 86 17737606271 www mastermachinerys com 19 DIAGRAM 1 Complete Edger Trowel...
Страница 22: ...Henan Master Machinery Co Ltd Tel 86 17737606271 www mastermachinerys com 22 2 Gearbox Assembly...
Страница 24: ...Henan Master Machinery Co Ltd Tel 86 17737606271 www mastermachinerys com 24 3 Pressure Plate Assembly...
Страница 26: ...Henan Master Machinery Co Ltd Tel 86 17737606271 www mastermachinerys com 26 4 Spider Plate Assembly...