Henan Master Machinery Co., Ltd
Tel:(+86)17737606271
www.mastermachinerys.com
10
All you need to do is unfold the handle and fasten the knob. Remove any shipping
or packing materials. Be sure to remove and discard the band securing the
safety/stop switch to the left handle. This serves only to facilitate shipping and is
not intended to be a permanent feature. When removing the machine from the
carton, be careful to use the handles to left the unit from the carton. NEWER LIFT
THE MACHINE BY THE RING OR DISC. Filling the fuel tank and a brief check
of lubricant levels in preparation for operation is required.
IMPORTANT:
Before running machine with belt installed, ensure that engine
idles properly and that the safety-switch shuts off the engine.
ATTENTION:
For any information regarding engine adjustments, please refer to
the engine manual supplied.
OPERATION (Floating)
When the slab has set sufficiently firm that the operator's footprint leaves a very
slight depression on the surface of the slab, it is ready for the floating operation.
Guiding the machine on the slab is very simple; a slight upward lift of the handle
causes the machine to travel to the left. Holding the handle in the neutral position,
will slowly cause the machine to spin in one spot. Slight downward pressure on
the handle cause the machine to the travel to the right. Best results are obtained by
covering approximately 4" on each turn. In other words, let the machine move
right or left, backwards or forwards, approximately 4" with each revolution of the
trowels. To fill a hole or cut down hump, move the unit back and forth over the
problem area.
Under normal operating conditions the machine should cover as much as 1000 sq.
ft. in about 15 minutes. It is recommended that a slight tension on the trowel
control cable, (but not a definite tilt), during the floating operation will cause the
machine to operate much smoother. After the floated slab has set sufficiently, it is
ready for the finishing operation.
CAUTION:
Do not let the machine stand in one spot on the soft cement. Lift
Содержание FWT24
Страница 19: ...Henan Master Machinery Co Ltd Tel 86 17737606271 www mastermachinerys com 19 DIAGRAM 1 Complete Edger Trowel...
Страница 22: ...Henan Master Machinery Co Ltd Tel 86 17737606271 www mastermachinerys com 22 2 Gearbox Assembly...
Страница 24: ...Henan Master Machinery Co Ltd Tel 86 17737606271 www mastermachinerys com 24 3 Pressure Plate Assembly...
Страница 26: ...Henan Master Machinery Co Ltd Tel 86 17737606271 www mastermachinerys com 26 4 Spider Plate Assembly...