6
Electrical Requirements:
Always follow all local electrical codes when installing our water
treatment equipment.
1. Provide an 115v/60Hz properly grounded dedicated electrical
outlet. (It’s very important that the polarity be correct)
Avoid using outlets that are switch controlled.
2. Maximum amperage required is 5 amps.
3. Make sure the electrical service provides power 24 hours per day.
We recommend installing a
surge protector
to protect unit from
power surges, which are not covered by warranty.
Brine Tank:
1. The brine tank should be located directly beside the Combination
Unit mineral tank.
2. Connect the 3/8" poly tubing to the 3/8” white elbow compression
fitting located on the right side of the Logix control valve.
See Figure Below.
The 464 brine shutoff valve contains a float that controls the water
level in the brine tank. The float height was preset at the factory.