INSTRUCTIONS FOR INSTALLING
AKI SUNKEN TUB
18
IMPORTANT:
- The wall must be built after installation
- In the DROP-IN DECK version, leave a gap of 2 mm between the wall and the deck
which must have a soft surface. The bath must never under any circumstances be
supported by the deck. The bath must rest on the floor.
- In the case of DROP-IN SUNKEN installation, there must be a support under the
deck in the area of the four corners. The surface of the support must be soft. Leave a
gap of 2 mm.
-Leave a gap of 4 mm between the wall and the deck to allow for expansion of the
Cristalplant. This space can be compensated for with neutral silicon.
BATH DECK
BATH BOTTOM
Fig.12