INSTRUCTIONS FOR INSTALLING
AKI SUNKEN TUB
17
Operation 7:
Place the bath horizontally on the polystyrene spacers, inserting a third spacer (fig. 4).
Spacer 3 - H.22
Fig.10
Operation 8:
Test the seal of the bath before removing the polystyrene spacers from underneath it.
If there are no leaks of water, remove the spacers, making sure the extendable hose is
inside the floor drain (fig. 5).
Fig.11