INSTALLATION INSTRUCTIONS
Material supplied:
•
Trap
•
Siphon with extendable hose
•
Polystyrene floor drain template
•
8 x polystyrene spacers
•
Paper template of bath dimensions
•
Scotch Brite pad
•
3 straps for pre-installation handling
Important:
•
Seven people are required to move the bath.
•
The bath should be moved to the bathroom closed in the
crate.
•
To install, use the straps and at least two suction cups with a
minimum capacity of 100 kg.
•
In the case of an existing bathroom, the polystyrene template
is used to make the hole for the water drain hose.
•
If the bathroom is under construction, the polystyrene
template is used to create the floor drain during construction
of the bed and screed and laying the floor.
•
The bath must rest on a finished perfectly flat floor.
•
To respect the environment, if you decide not to use the
product any longer, it should be taken to a municipal waste
collection centre.
11