Masport P36-3 Gas Inbuilt
11
FLUEING
Direct Flue System (Flex)
Horizontal Terminations Only
These flueing systems, in combination with the P36 Room Sealed Gas Fireplace, have been tested and listed as a Direct Vent type flue system
by the Australian Gas Association. The location of the termination cap must conform to the requirements in the Flue Terminal Locations diagram
on page 10.
Direct Flue (Flex) System Termination Kit (Part # 946-515) includes all the parts needed to install the P36 with a maximum run of
1.2m.
1) 175mm dia. flexible liner (1200mm length)
2) 100mm dia. flexible liner (1200mm length)
3) spring spacers (4)
4) thimble (2)
5) AstroCap termination cap (1)
6) screws (12)
7) tube of Mill Pac (1)
8) plated screws (8)
9) screws #8 x 1-1/2" Drill Point, Stainless Steel (4)
If longer runs are needed, the Direct Flue
system (Flex) # 946-516 includes all the parts
needed to install the P36 with a maximum 3.0m
run.
1) 175mm dia. flexible liner (3.0m length)
2) 100mm dia. flexible liner (3.0m length)
3) spring spacers (7)
4) thimble (2)
5) AstroCap termination cap (1)
6) screws (12)
7) tube of Mill Pac (1)
8) plated screws (8)
9) screws #8 x 1-1/2" Drill Point, Stainless Steel (4)
Notes:
1) Liner sections should be continuous without any joints or seams.
2) Only Flex pipe purchased from Masport may be used for Flex installations.
3) If you are installing the P36 into a Masport Mantel Kit, use the minimum horizontal vent height (centre-line of 1029mm).
Remember to include the mantel base in your calculations and to maintain the 32mm clearance (38mm with Flex) to the
underside of the mantel top.
INSTALLATION