![masosine MR 160 Скачать руководство пользователя страница 11](http://html.mh-extra.com/html/masosine/mr-160/mr-160_manual_1735327011.webp)
Revision 8.0 / July 2015
11
14.2 Cleaning in the CIP circuit
14.3 Manual cleaning
Manual cleaning of the pump can be performed after complete dismantling of the pump.
Pay attention to parts sensitive to breakage!!
If the pump is stopped during the process and opened for the purpose of cleaning or checking,
the responsible fitter or electrician must be notified to undertake suitable measures so that the pump
cannot be put into operation (remove fuses, notify electrician).
The pump may also never be put into operation if the housing cover is removed. Should the pump
not yet be connected to the piping system, then reliable care must be taken that the drive machine
cannot be switched on.
Observe the accident prevention regulations!!
14.4 Sterilization
Sterilisation of the pump with standard equipment is possible
up to 110°C only in standstill!
In the case of special equipment of the pump or higher temperatures, please always firstly consult the manufacturer!
15 Oil change
The oil must be changed once yearly or every 1500 operating hours for
the pumps of the serie
MR 160 and SPS 600L
. The standard operation
for changing oil would be to loosen all four bolts on the bearing housing
cover (Pos. 21) and all parts should be removed (bolts and cover). At
this point the used oil can be drained. After that the bearing housing
cover has to be replaced and the bolts would be retighten. The oil sight
glass in the bearing block should be filled up to the middle. (ca 0.3 Liter).
Please use the following oil grade or similar:
***(Standard first filling of the
WATSON-MARLOW MasoSine-
PUMPS
)***
Klüberoil 4 UH 1-220 N (lubricating oil for the food and pharmaceutical
industry)
Our standard first filling is only suitable for
temperatures above
–10° C.
If you come below
–10° C you must replace the oil !
zurück zur Anlage
1. Purging surge
Open the choke valve and let the
WATSON-MARLOW MasoSine-
PUMPS
run with maximum speed to perform the first rough cleaning.
2. Purging
Set the choke valve so that the pressure side of the pump is at least
3.0 bar higher than the suction side.
Open the open/close valve to guarantee cleaning of the series
connected devices.
Back to the plant
Choke
Valve
X
+
3 bar
Open / Close Valve
from CIP plant
X -
bar
Oil inlet
Oil glass
Содержание MR 160
Страница 1: ...Revision 8 0 July 2015 1 Manual Technical Documentation Watson Marlow MasoSine PUMP MR 160 SPS 600L ...
Страница 21: ...Revision 8 0 July 2015 21 24 Drawings Stock lists MasoSine Pump MR 160 SPS 600L ...
Страница 22: ...Revision 8 0 July 2015 22 MasoSine Pump MR 160 SPS 600L ...
Страница 23: ...Revision 8 0 July 2015 23 MasoSine Pump MR 160 SPS 600L ...
Страница 24: ...Revision 8 0 July 2015 24 MasoSine Pump MR 160 SPS 600L ...
Страница 25: ...Revision 8 0 July 2015 25 ...
Страница 26: ...Revision 8 0 July 2015 26 ...