2 PRESCRIPTIONS FOR SAFETY DURING INSTALLATION AND SETUP

• The personnel in charge of installation and starting of the generator must always wear a protective helmet; wear

safety shoes and overalls.

• Immediately change wet overalls.

• Use protective gloves.

• Do not leave disassembled parts, tools or anything else not forming part of the system on or near the engine.

• Never leave inflammable liquids or cloths soaked in inflammable liquids in proximity of the generator, near electric

equipment, (including lamps), or parts of the electrical system.

• Take the necessary precautions to prevent the danger of electrocution.

3 INSTALLATION

3.1 Characteristics of the installation space

The generator must be installed in a sufficiently

ventilated room, able to assure 

800 m

3

/h

 air, which

corresponds to the quantity of air required for alternator

cooling and engine combustion.

The space must be separate and acoustically insulated

from living areas.

The generator should be positioned so that normal

maintenance operations can easily be carried out.

Propulsion motors are recommended for installation in

the area as long as they comply with the above-

mentioned conditions.

3.2 Fastening the unit to the ground

To fasten the unit securely, a base should be installed

to absorb vibrations and support the weight.

Drill holes in the base according to the instructions in

Fig. 

1

.

3.3 Ventilation

The generator is equipped with an internal forced cooling

system by means of the alternator fan.

The quantity of air required for alternator cooling and

engine combustion is aspirated through the opening

shown in Fig. 

2

, ref. 

A

, and is expelled through the two

side vents shown in Fig. 

2

, ref. 

B

.  Therefore, ensure

that these openings are always clear.

4 COOLING WATER CIRCUIT

The engine is cooled by an closed circuit system heat

exchanger.

On installation a sea water feed circuit should be fitted

for cooling and a waste system to expel the mixture of

flue gas and water.

4.1 Sea water feed system

Boats usually use one of two systems to collect water,

(Fig.

 7

).

1

Direct infeed system.

2

System with baffle.

mase 

recommends the direct infeed system, (Fig. 

7

,

ref. 

1

), since this system prevents water under pressure

entering the suction ducts and instead forms a pressure

which can easily be overcome by the water pump of

the electric generator.

Do not apply any type of protective hood to the direct

infeed system.

The baffle system might cause the following problems.

a

If it is installed with the slots facing the prow.

In this case, during navigation and with the electric

generator off, pressure is accumulated in the water

infeed duct which might cause the system to fill up,

even as far as the exhaust port, allowing water to

enter the cylinders.

b

If it is installed with the slots facing the stern.

In this case a depression might accumulate in the

water infeed duct during navigation, preventing the

water pump from starting up the cooling plant, or

limiting the capacity and subsequently causing the

electric generator to overheat.

Содержание IS 30T

Страница 1: ...GB INSTALLATION MANUAL IS 30 T 50 Hz...

Страница 2: ...IS 30 T Fig 1 Fig 2 83 0 1460 675 B B A 2 Fig 3...

Страница 3: ...IS 30 T Fig 7 Fig 6 Fig 5 Fig 8 Fig 4 2 1 Valvola antisifone Anti siphon valve Soupape antisiphon Beluchter...

Страница 4: ...IS 30 T Fig 12 Fig 10 Fig 9 2 3 1 4 1 2 3 2 1 Fig 11...

Страница 5: ...IS 30 T Fig 13 Wiring diagram STANDARD version...

Страница 6: ...IS 30 T Fig 14 Wiring diagram RINA version...

Страница 7: ...Ventilation 21 4 COOLING WATER CIRCUIT 21 4 1 Sea water feed system 21 4 2 Typical installation with generator above the waterline 22 4 3 Typical installation with generator below the waterline 22 4 4...

Страница 8: ...onomy and a longer life of the generator It is warmly recommended to carefully read the contents of this manual and the reference documents only thus can regular functioning and reliability of the gen...

Страница 9: ...equipped with an internal forced cooling system by means of the alternator fan The quantity of air required for alternator cooling and engine combustion is aspirated through the opening shown in Fig 2...

Страница 10: ...he rotor of the water pump might be damaged during start up for the same reason when the unit is first started up the suction tube from the valve to the pump should be filled manually Ball tap 1 2 gen...

Страница 11: ...the indicated It should be connected to the terminal of the generator Fig 9 ref 4 with cables of section 25 mm2 up to distances of 5 m and with cables of section 35 mm2 for longer distances and follo...

Страница 12: ...is equipped with a magnetothermal switch which cuts the power in the event of an overload or short circuit Table of characteristics 6 4 Generator mains switching A switch should be placed on the line...

Страница 13: ...gauge instrument 28 Remote control panel kit with instruments optional 29 Remote control panel kit standard equipment 8 2 RINA version See Fig 14 1 Magnetothermal switch 2 Hour counter 3 Alternator 4...

Отзывы: